MVP Southgate
From the ProvenHand pipeline wiki
This is an old revision of this page, as edited by ProvenHand at 17:10, 3 October 2026 (Imported from public sources (FERC, EIA, operators, contractors, trade press)). It may differ significantly from the current version.
MVP Southgate is a natural gas pipeline in Virginia and North Carolina, operated by Mountain Valley Pipeline LLC (EQT). Construction began in 2026. It runs 31.3 miles of 30" pipe.[1]
| MVP Southgate | |
|---|---|
| Also called | Mountain Valley Southgate, Southgate, MVP Southgate Amendment |
| General information | |
| Commodity | Natural gas |
| Operator | Mountain Valley Pipeline LLC (EQT) |
| States | Virginia, North Carolina |
| Construction started | 2026 |
| Contractors |
|
| Technical information | |
| Length | 31.3 mi |
| Pipe size | 30" |
| On ProvenHand | |
| Hands listed | 0 |
MVP Southgate is a natural gas pipeline in Virginia and North Carolina, operated by Mountain Valley Pipeline LLC (EQT). Construction began in 2026. It runs 31.3 miles of 30" pipe.[1]
Contractorsedit
| Contractor | Scope |
|---|---|
| Precision Pipeline[4] | Mainline (named as the prime on a Teamsters dispatch for the job) |
| Hoover Construction[4] | Drilling and blasting on the 31.3 miles of 30-inch (start date Aug 3, 2026) |
Referencesedit
This pipeline article is a stub. You can help ProvenHand by expanding it.