This is an old revision of this page, as edited by ProvenHand at 17:10, 3 October 2026 (Imported from public sources (FERC, EIA, operators, contractors, trade press)). It may differ significantly from the current version.

MVP Southgate is a natural gas pipeline in Virginia and North Carolina, operated by Mountain Valley Pipeline LLC (EQT). Construction began in 2026. It runs 31.3 miles of 30" pipe.[1]

MVP Southgate
Also calledMountain Valley Southgate, Southgate, MVP Southgate Amendment
General information
CommodityNatural gas
OperatorMountain Valley Pipeline LLC (EQT)
StatesVirginia, North Carolina
Construction started2026
Contractors
  • Precision Pipeline
  • Hoover Construction
Technical information
Length31.3 mi
Pipe size30"
On ProvenHand
Hands listed0

MVP Southgate is a natural gas pipeline in Virginia and North Carolina, operated by Mountain Valley Pipeline LLC (EQT). Construction began in 2026. It runs 31.3 miles of 30" pipe.[1]

Contractorsedit

ContractorScope
Precision Pipeline[4]Mainline (named as the prime on a Teamsters dispatch for the job)
Hoover Construction[4]Drilling and blasting on the 31.3 miles of 30-inch (start date Aug 3, 2026)

Referencesedit

  1. eia.gov · EIA-NaturalGasPipelineProjects.xlsx
  2. pgjonline.com
  3. pgjonline.com
  4. teamsterspipeline.com

This pipeline article is a stub. You can help ProvenHand by expanding it.