Valley Crossing Project

From the ProvenHand pipeline wiki

This is an old revision of this page, as edited by ProvenHand at 17:10, 3 October 2026 (Imported from public sources (FERC, EIA, operators, contractors, trade press)). It may differ significantly from the current version.

Valley Crossing Project is a natural gas pipeline in Texas, operated by Enbridge. Construction began in 2017 and the line entered service in 2018. It runs 168 miles of 42", 48" pipe.[1]

Valley Crossing Project
Also calledValley Crossing Pipeline, Valley Crossing, Nueces-to-Brownsville Pipeline, VCP
General information
CommodityNatural gas
OperatorEnbridge
StateTexas
Construction started2017
In service2018
Contractors
  • Strike
Technical information
Length168 mi
Pipe size42", 48"
On ProvenHand
Hands listed2

Valley Crossing Project is a natural gas pipeline in Texas, operated by Enbridge. Construction began in 2017 and the line entered service in 2018. It runs 168 miles of 42", 48" pipe.[1]

Contractorsedit

ContractorScope
Strike[5]pipeline construction (listed by Pipeline News under Strike Construction, owner Spectra Energy)

Referencesedit

  1. lngindustry.com
  2. universalpegasus.com
  3. prnewswire.com · spectra-energy-awarded-15-billion-nueces
  4. chron.com
  5. s3.amazonaws.com · Ongoing_Projects.pdf

This pipeline article is a stub. You can help ProvenHand by expanding it.