10" Refined Fuels Pipeline Williams,Mountrail,Ward

From the ProvenHand pipeline wiki

10" Refined Fuels Pipeline Williams,Mountrail,Ward is a refined products pipeline replacement in North Dakota, operated by Cenex Pipeline LLC. Construction began in 2019 and the line entered service in 2020. It runs 149.7 miles of 10" pipe.

10" Refined Fuels Pipeline Williams,Mountrail,Ward
General information
KindPipeline project[1]
Project typeReplacement[2]
StatusIn service[3]
CommodityRefined products[2]
Owner and operator
StateNorth Dakota[1]
CountiesMountrail, Ward, Williams[2]
Approved14 March 2018[2]
Construction started5 June 2019[4]
In serviceJune 2020[3]
North Dakota PSC casePU-17-097[1]
Contractors
Technical information
Length149.7 mi[2]
Pipe size10"[2]
Capacitymaximum capacity of 60,000 barrels per day[2]
Costtotal cost of the Project is approximately $115 million[2]
On ProvenHand
Hands listed0

10" Refined Fuels Pipeline Williams,Mountrail,Ward is a refined products pipeline replacement in North Dakota, operated by Cenex Pipeline LLC. Construction began in 2019 and the line entered service in 2020. It runs 149.7 miles of 10" pipe.

Contractorsedit

ContractorWorkPrime or subSpread
Frontier Services[4]PrimeSpread 1 (West)
Loenbro[4]PrimeSpread 2 (East)
Stealth Energy Group[3]subcontractor to Loenbro on portions of Spread 2 (scope not stated)Under LoenbroSpread 2 (East)
Kadrmas, Lee & Jackson[5]project consultant (ROW, survey, environmental inspection and construction supervision per the pre-construction minutes)

Inspection

Spreads

SpreadPrime contractorDates
Spread 1 (West)[6]Frontier Servicesfrom 10 June 2019
Spread 2 (East)[6]Loenbrofrom 5 June 2019

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on 10" Refined Fuels Pipeline Williams,Mountrail,Ward? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “North Dakota Public Service Commission: case search (pipeline siting)”. North Dakota Public Service Commission. Retrieved 3 October 2026.
  2. “Findings of Fact, Conclusions of Law and Order, Case No. PU-17-97 (Cenex 10-inch refined fuels pipeline)”. North Dakota Public Service Commission. 14 March 2018. Retrieved 3 October 2026.
  3. “As-Built Inspection Report, Cenex 10-inch Refined Fuels Pipeline, PU-17-97”. Stantec Consulting Services Inc. (filed with the North Dakota Public Service Commission). 28 May 2021. Retrieved 3 October 2026.
  4. “Construction Inspection Report, Cenex 10-inch Refined Fuels Pipeline, PU-17-97”. Wenck Associates, Inc. (filed with the North Dakota Public Service Commission). 23 October 2019. Retrieved 3 October 2026.
  5. “Notice of intent to commence construction and preconstruction conference call minutes (2019-05-22), Cenex 10-inch Refined Fuels Pipeline, PU-17-097”. Cenex Pipeline, LLC (filed with the North Dakota Public Service Commission). 24 May 2019. Retrieved 3 October 2026.
  6. “Final Monthly Construction Progress Report (January/February 2020), Cenex 10-inch Refined Fuels Pipeline, PU-17-097”. Cenex Pipeline, LLC (filed with the North Dakota Public Service Commission). 11 March 2020. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.