10.75-inch Crude Oil Pipeline - McKenzie County

From the ProvenHand pipeline wiki

10.75-inch Crude Oil Pipeline - McKenzie County is a crude oil pipeline in North Dakota, operated by Oasis Midstream Services LLC. Construction began in 2016. It runs 19 miles of 10.75" pipe.

10.75-inch Crude Oil Pipeline - McKenzie County
Also calledWild Basin to Johnsons Corner Crude Pipeline Project[1]
General information
KindPipeline project[2]
CommodityCrude oil[3]
Owner and operator
StateNorth Dakota[2]
CountiesMcKenzie[4]
Approved23 March 2016[3]
Construction started11 April 2016[5]
North Dakota PSC casePU-15-733[2]
Contractors
Technical information
Length19 mi[3]
Pipe size10.75"[3]
Cost$13,000,000 estimated investment (PSC siting spreadsheet)[3]
On ProvenHand
Hands listed0

10.75-inch Crude Oil Pipeline - McKenzie County is a crude oil pipeline in North Dakota, operated by Oasis Midstream Services LLC. Construction began in 2016. It runs 19 miles of 10.75" pipe.

Contractorsedit

ContractorWork
Northwinds Construction[1]construction contractor listed among the pre-construction meeting project personnel (project manager attended)

Inspection

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on 10.75-inch Crude Oil Pipeline - McKenzie County? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “Preconstruction meeting minutes, case PU-15-733, docket 38”. E3 Environmental, LLC (filed with the North Dakota Public Service Commission). 29 March 2016. Retrieved 3 October 2026.
  2. “North Dakota Public Service Commission: case search (pipeline siting)”. North Dakota Public Service Commission. Retrieved 3 October 2026.
  3. “North Dakota PSC siting applications spreadsheet (siting cases 2005 to present)”. North Dakota Public Service Commission. Retrieved 3 October 2026.
  4. “ND PSC case PU-15-733 docket list: 10.75-inch Crude Oil Pipeline - McKenzie County”. North Dakota Public Service Commission. Retrieved 3 October 2026.
  5. “Topsoil Removal Inspection Report, case PU-15-733, docket 42”. ProSource Technologies, Inc. (filed with the North Dakota Public Service Commission). 2 May 2016. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.