10.75-inch Crude Oil Pipeline - McKenzie County
From the ProvenHand pipeline wiki
10.75-inch Crude Oil Pipeline - McKenzie County is a crude oil pipeline in North Dakota, operated by Oasis Midstream Services LLC. Construction began in 2016. It runs 19 miles of 10.75" pipe.
| 10.75-inch Crude Oil Pipeline - McKenzie County | |
|---|---|
| Also called | Wild Basin to Johnsons Corner Crude Pipeline Project[1] |
| General information | |
| Kind | Pipeline project[2] |
| Commodity | Crude oil[3] |
| Owner and operator | |
| State | North Dakota[2] |
| Counties | McKenzie[4] |
| Approved | 23 March 2016[3] |
| Construction started | 11 April 2016[5] |
| North Dakota PSC case | PU-15-733[2] |
| Contractors | |
| Technical information | |
| Length | 19 mi[3] |
| Pipe size | 10.75"[3] |
| Cost | $13,000,000 estimated investment (PSC siting spreadsheet)[3] |
| On ProvenHand | |
| Hands listed | 0 |
10.75-inch Crude Oil Pipeline - McKenzie County is a crude oil pipeline in North Dakota, operated by Oasis Midstream Services LLC. Construction began in 2016. It runs 19 miles of 10.75" pipe.
Contractorsedit
| Contractor | Work |
|---|---|
| Northwinds Construction[1] | construction contractor listed among the pre-construction meeting project personnel (project manager attended) |
Inspection
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on 10.75-inch Crude Oil Pipeline - McKenzie County? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “Preconstruction meeting minutes, case PU-15-733, docket 38”. E3 Environmental, LLC (filed with the North Dakota Public Service Commission). 29 March 2016. Retrieved 3 October 2026.
- “North Dakota Public Service Commission: case search (pipeline siting)”. North Dakota Public Service Commission. Retrieved 3 October 2026.
- “North Dakota PSC siting applications spreadsheet (siting cases 2005 to present)”. North Dakota Public Service Commission. Retrieved 3 October 2026.
- “ND PSC case PU-15-733 docket list: 10.75-inch Crude Oil Pipeline - McKenzie County”. North Dakota Public Service Commission. Retrieved 3 October 2026.
- “Topsoil Removal Inspection Report, case PU-15-733, docket 42”. ProSource Technologies, Inc. (filed with the North Dakota Public Service Commission). 2 May 2016. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.