12-inch Crude Oil Pipeline - McKenzie County
From the ProvenHand pipeline wiki
12-inch Crude Oil Pipeline - McKenzie County is a crude oil pipeline in North Dakota, operated by Tesoro - High Plains Pipeline Company. Construction began in 2016. It runs 1.4 miles of 12" pipe.
| 12-inch Crude Oil Pipeline - McKenzie County | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Commodity | Crude oil[2] |
| Owner and operator | |
| State | North Dakota[1] |
| Counties | McKenzie[3] |
| Approved | 9 March 2016[2] |
| Construction started | 12 August 2016[4] |
| North Dakota PSC case | PU-15-720[1] |
| Technical information | |
| Length | 1.4 mi[2] |
| Pipe size | 12"[2] |
| Cost | $8,900,000 estimated investment (PSC siting spreadsheet)[2] |
| On ProvenHand | |
| Hands listed | 0 |
12-inch Crude Oil Pipeline - McKenzie County is a crude oil pipeline in North Dakota, operated by Tesoro - High Plains Pipeline Company. Construction began in 2016. It runs 1.4 miles of 12" pipe.
Inspection
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on 12-inch Crude Oil Pipeline - McKenzie County? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “North Dakota Public Service Commission: case search (pipeline siting)”. North Dakota Public Service Commission. Retrieved 3 October 2026.
- “North Dakota PSC siting applications spreadsheet (siting cases 2005 to present)”. North Dakota Public Service Commission. Retrieved 3 October 2026.
- “ND PSC case PU-15-720 docket list: 12-inch Crude Oil Pipeline - McKenzie County”. North Dakota Public Service Commission. Retrieved 3 October 2026.
- “Progress reports July, August, and September 2016, case PU-15-720, docket 42”. Tesoro High Plains Pipeline Company LLC (filed with the North Dakota Public Service Commission). 14 November 2016. Retrieved 3 October 2026.
- “Pre-Construction Phone Conference and Route Inspection Reports, case PU-15-720, docket 44”. Ulteig Engineers, Inc. (filed with the North Dakota Public Service Commission). 7 February 2017. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.