12-Inch Crude Oil Pipeline - Williams County
From the ProvenHand pipeline wiki
12-Inch Crude Oil Pipeline - Williams County is a crude oil pipeline in North Dakota, operated by Hess North Dakota Export Logistics LLC. Construction began in 2016. It runs 1.1 miles of 12" pipe.
| 12-Inch Crude Oil Pipeline - Williams County | |
|---|---|
| Also called | ETP Crude Oil Interconnect Project[1] |
| General information | |
| Kind | Pipeline project[2] |
| Project type | New build[3] |
| Status | In service[4] |
| Commodity | Crude oil[3] |
| Owner and operator | |
| State | North Dakota[2] |
| Counties | Williams[3] |
| Approved | 7 September 2016[3] |
| Construction started | 14 September 2016[5] |
| North Dakota PSC case | PU-16-189[2] |
| Technical information | |
| Length | 1.1 mi[3] |
| Pipe size | 12"[3] |
| Cost | total anticipated cost of the Project is approximately $4.5 million[3] |
| On ProvenHand | |
| Hands listed | 0 |
12-Inch Crude Oil Pipeline - Williams County is a crude oil pipeline in North Dakota, operated by Hess North Dakota Export Logistics LLC. Construction began in 2016. It runs 1.1 miles of 12" pipe.
Inspection
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on 12-Inch Crude Oil Pipeline - Williams County? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “Monthly construction progress report (period 2016-10-02 to 11-06), Hess ETP Pipeline Project, PU-16-189”. Hess North Dakota Export Logistics LLC (filed with the North Dakota Public Service Commission). 10 November 2016. Retrieved 3 October 2026.
- “North Dakota Public Service Commission: case search (pipeline siting)”. North Dakota Public Service Commission. Retrieved 3 October 2026.
- “Order on Recommended Findings of Fact, Conclusions of Law and Order, Case No. PU-16-189 (Hess 12-inch crude oil pipeline, Williams County)”. North Dakota Public Service Commission. 7 September 2016. Retrieved 3 October 2026.
- “As-built Construction Inspection Report, Hess ETP Pipeline, PU-16-189”. Carlson McCain, Inc. (filed with the North Dakota Public Service Commission). 16 December 2016. Retrieved 3 October 2026.
- “Notice of intent to begin construction, PU-16-189”. Hess North Dakota Export Logistics LLC (filed with the North Dakota Public Service Commission). 15 September 2016. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.