2015 Elko Area Expansion Project
From the ProvenHand pipeline wiki
Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.
2015 Elko Area Expansion Project is a natural gas pipeline in Nevada, operated by Paiute Pipeline Company.
| 2015 Elko Area Expansion Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Lateral[2] or Expansion[3][sources disagree] |
| Status | In service[2] |
| Commodity | Natural gas[2] |
| Operator | |
| Owner and operator | |
| State | Nevada[2] |
| Counties | Elko[4] |
| Approved | 14 May 2015[1] |
| In service | 7 October 2015[2] or 7 January 2016[5][sources disagree] |
| FERC docket | CP14-509[1] |
| FERC pre-filing docket | PF14-4[3] |
| Technical information | |
| Length | 35 mi[2] or 35.2 mi[4][sources disagree] |
| Pipe size | 8"[4] |
| Capacity | 22 MMcf/d additional capacity (EIA)[2] |
| Cost | approximately $34,741,346 (certificate order)[4] |
| On ProvenHand | |
| Hands listed | 0 |
2015 Elko Area Expansion Project is a natural gas pipeline in Nevada, operated by Paiute Pipeline Company.
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
| Fact | Values given |
|---|---|
| Project type | |
| In service | |
| Length |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on 2015 Elko Area Expansion Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “FERC eLibrary docket CP14-509”. Federal Energy Regulatory Commission. 27 June 2014. Retrieved 3 October 2026.
- “Order Issuing Certificate, 2015 Elko Area Expansion Project (CP14-509)”. Federal Energy Regulatory Commission. 14 May 2015. Retrieved 4 October 2026.
- “Notice of Placement into Service, 2015 Elko Area Expansion Project (CP14-509)”. Paiute Pipeline Company (filed with FERC). 12 January 2016. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.