2023 Line Section 27 Expansion Project

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

2023 Line Section 27 Expansion Project is a natural gas pipeline expansion in North Dakota, operated by WBI Energy Transmission, Inc.. Construction began in 2023. It runs 0.2 miles of 24" pipe.

2023 Line Section 27 Expansion Project
General information
KindPipeline project[1]
Project typeExpansion[1][2]
StatusIn service[1][3]
CommodityNatural gas[1]
Operator
Owner and operator
Facility project
StateNorth Dakota[1]
CountiesMcKenzie[4]
Construction startedApril 2023[5]
In service15 March 2024[1] or 1 March 2024[3][6][sources disagree]
FERC docketCP22-512[1]
Technical information
Length0.2 mi[4]
Pipe size24"[1][4]
Capacity175 MMcf/d additional capacity (EIA)[1]
Cost$32.6 million (EIA estimate; no dollar year given)[1][4]
On ProvenHand
Hands listed0

2023 Line Section 27 Expansion Project is a natural gas pipeline expansion in North Dakota, operated by WBI Energy Transmission, Inc.. Construction began in 2023. It runs 0.2 miles of 24" pipe.

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
In service

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on 2023 Line Section 27 Expansion Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  2. “FERC eLibrary docket CP22-512”. Federal Energy Regulatory Commission. 19 September 2022. Retrieved 3 October 2026.
  3. “2023 Line Section 27 Expansion project page”. WBI Energy Transmission, Inc. Retrieved 3 October 2026.
  4. “Environmental Assessment Report, 2023 Line Section 27 Expansion Project (CP22-512)”. FERC. 21 November 2022. Retrieved 3 October 2026.
  5. “Weekly Construction Progress Report No. 1 (April 17 to 23, 2023), 2023 Line Section 27 Expansion Project (CP22-512)”. WBI Energy Transmission, Inc. (filed with FERC). 28 April 2023. Retrieved 3 October 2026.
  6. “Post-Construction Noise Survey Extension Request, Line Section 27 Expansion Project (CP22-512)”. WBI Energy Transmission, Inc. (filed with FERC). 17 March 2026. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.