2024 Comite River Relocation Project is a natural gas pipeline replacement in Louisiana, operated by Florida Gas Transmission Company, LLC. Construction began in 2024.

2024 Comite River Relocation Project
General information
KindPipeline project[1]
Project typeReplacement[1]
StatusIn service[2]
CommodityNatural gas[3]
Owner and operator
StateLouisiana[3]
CountiesEast Baton Rouge[3]
Construction started31 October 2024[4]
FERC docketCP24-501[1]
Technical information
Pipe size24", 30"[3]
Cost$26.0 million[3]
On ProvenHand
Hands listed0

2024 Comite River Relocation Project is a natural gas pipeline replacement in Louisiana, operated by Florida Gas Transmission Company, LLC. Construction began in 2024.

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on 2024 Comite River Relocation Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC eLibrary docket CP24-501”. Federal Energy Regulatory Commission. 23 July 2024. Retrieved 3 October 2026.
  2. “Final Weekly Environmental Status Report No. 66 (Jan 25 to Feb 2, 2026), Comite River Relocation Project (CP24-501)”. Florida Gas Transmission Company, LLC (filed with FERC). 6 February 2026. Retrieved 4 October 2026.
  3. “Environmental Assessment Report, Comite River Relocation Project (CP24-501)”. FERC. 4 October 2024. Retrieved 4 October 2026.
  4. “Weekly Environmental Status Report No. 1 (Oct 27 to Nov 2, 2024), Comite River Relocation Project (CP24-501)”. Florida Gas Transmission Company, LLC (filed with FERC). 8 November 2024. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.