2024 Line 1400 and 1401 Intermountain Pipe Replacement Project is a natural gas pipeline replacement in Idaho, operated by Northwest Pipeline LLC. It was built and entered service in 2024. It runs 5.5 miles of 22", 24" pipe.

2024 Line 1400 and 1401 Intermountain Pipe Replacement Project
General information
KindPipeline project[1]
Project typeReplacement[1]
StatusIn service[2]
CommodityNatural gas[3]
Owner and operator
StateIdaho[3]
CountiesAda, Canyon[3]
Construction started2024[4]
In serviceNovember 2024[2]
FERC docketCP24-87[1]
Technical information
Length5.5 mi[3]
Pipe size22", 24"[3]
Cost$23,629,734 (cost stated in FERC staff EA)[3]
On ProvenHand
Hands listed0

2024 Line 1400 and 1401 Intermountain Pipe Replacement Project is a natural gas pipeline replacement in Idaho, operated by Northwest Pipeline LLC. It was built and entered service in 2024. It runs 5.5 miles of 22", 24" pipe.

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on 2024 Line 1400 and 1401 Intermountain Pipe Replacement Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC eLibrary docket CP24-87”. Federal Energy Regulatory Commission. 7 March 2024. Retrieved 3 October 2026.
  2. “Weekly Status Report No. 25 (November 10 to 16, 2024), 2024 1400/1401 Intermountain Pipe Replacement Project (CP24-87)”. Northwest Pipeline LLC (filed with FERC). 21 November 2024. Retrieved 3 October 2026.
  3. “Environmental Assessment Report, Intermountain Pipe Replacement Project, Lines 1400 and 1401 (CP24-87)”. FERC. 17 May 2024. Retrieved 3 October 2026.
  4. “Weekly Status Report No. 1 (May 27 to June 2, 2024), 2024 1400/1401 Intermountain Pipe Replacement Project (CP24-87)”. Northwest Pipeline LLC (filed with FERC). 7 June 2024. Retrieved 3 October 2026.