5423 CR TETLP 270 Class Replacements Project

From the ProvenHand pipeline wiki

5423 CR TETLP 270 Class Replacements Project is a pipeline replacement, operated by Texas Eastern Transmission, LP. Construction began in 2025.

5423 CR TETLP 270 Class Replacements Project
General information
Project typeReplacement[1][2]
StatusUnder construction[3]
Owner and operator
CountiesRutherford[2]
Approved29 July 2025[4]
Construction started19 August 2025[4]
FERC docketCP25-492[1]
Technical information
Pipe size30"[2]
Cost$32.1 million[2]
On ProvenHand
Hands listed0

5423 CR TETLP 270 Class Replacements Project is a pipeline replacement, operated by Texas Eastern Transmission, LP. Construction began in 2025.

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on 5423 CR TETLP 270 Class Replacements Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC eLibrary docket CP25-492”. Federal Energy Regulatory Commission. 15 May 2025. Retrieved 3 October 2026.
  2. “Environmental Assessment Report for Texas Eastern Transmission LP's Sections 157.205 and 157.208 – Prior Notice Filing under CP25-492.”. Federal Energy Regulatory Commission (staff document). 23 July 2025. Retrieved 3 October 2026.
  3. “Texas Eastern Transmission, LP submits Monthly Report No. 46 for the period of 07/27/2026 to 08/23/2026 re the 5423 CR TETLP 270 Class Replacements Project under CP25-492.”. Texas Eastern Transmission, LP (filed with FERC). 26 August 2026. Retrieved 3 October 2026.
  4. “Texas Eastern Transmission, LP submits Weekly Status Report No. 1 for the period of 08/19/2025 to 08/24/2025 re the 5423 CR TETLP 270 Class Replacements Project under CP25-492.”. Texas Eastern Transmission, LP (filed with FERC). 28 August 2025. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.