8-inch Crude Oil Pipeline - McKenzie County
From the ProvenHand pipeline wiki
8-inch Crude Oil Pipeline - McKenzie County is a crude oil pipeline in North Dakota, operated by Bridger Pipeline LLC. Construction began in 2021.
| 8-inch Crude Oil Pipeline - McKenzie County | |
|---|---|
| Also called | Johnson's Corner to Wilson Pipeline Project[1] |
| General information | |
| Kind | Pipeline project[2] |
| Status | In service[3] |
| Commodity | Crude oil[4] |
| Owner and operator | |
| State | North Dakota[2] |
| Counties | McKenzie[4] |
| Approved | 19 May 2021[4] |
| Construction started | 29 November 2021[5] |
| North Dakota PSC case | PU-20-430[2] |
| Contractors | |
| Technical information | |
| Pipe size | 8"[4] |
| Cost | estimated cost of the Project is $21 million[4] |
| On ProvenHand | |
| Hands listed | 0 |
8-inch Crude Oil Pipeline - McKenzie County is a crude oil pipeline in North Dakota, operated by Bridger Pipeline LLC. Construction began in 2021.
Contractorsedit
| Contractor | Work | Prime or sub |
|---|---|---|
| Loenbro Pipeline LLC[6] | Prime | |
| Dirty Birds LLC[5] | subcontractor to Loenbro Pipeline LLC (scope not stated in the daily report) | Under Loenbro Pipeline LLC |
Inspection
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on 8-inch Crude Oil Pipeline - McKenzie County? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “Pre-Construction Conference Meeting Minutes (2021-11-10), Johnson's Corner to Wilson Pipeline Project, PU-20-430”. Bridger Pipeline LLC (filed with the North Dakota Public Service Commission). 11 November 2021. Retrieved 4 October 2026.
- “North Dakota Public Service Commission: case search (pipeline siting)”. North Dakota Public Service Commission. Retrieved 3 October 2026.
- “2.4-mile As-Built Construction Inspection Report, Bridger 8-inch Crude Oil Pipeline, PU-20-430”. Short Elliott Hendrickson Inc. (filed with the North Dakota Public Service Commission). 7 October 2022. Retrieved 3 October 2026.
- “Findings of Fact, Conclusions of Law and Order, Case No. PU-20-430 (Bridger 8-inch crude oil pipeline, McKenzie County)”. North Dakota Public Service Commission. 19 May 2021. Retrieved 3 October 2026.
- “Topsoil Removal Inspection Report, Bridger 8-inch Crude Oil Pipeline, PU-20-430”. Short Elliott Hendrickson Inc. (filed with the North Dakota Public Service Commission). 20 December 2021. Retrieved 3 October 2026.
- “Construction Inspection Report, Bridger 8-inch Crude Oil Pipeline, PU-20-430”. Short Elliott Hendrickson Inc. (filed with the North Dakota Public Service Commission). 30 December 2021. Retrieved 3 October 2026.
- “Purchase of service contract for construction inspection, Case No. PU-20-430”. North Dakota Public Service Commission. 11 June 2021. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.