Acadiana Project
From the ProvenHand pipeline wiki
Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.
Acadiana Project is a natural gas pipeline expansion in Louisiana, operated by Kinder Morgan Louisiana Pipeline LLC/Acadiana Project.
| Acadiana Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Expansion[2] |
| Status | In service[2][3] |
| Commodity | Natural gas[2] |
| Operator | Kinder Morgan Louisiana Pipeline LLC/Acadiana Project[1] |
| Operator | |
| Owner and operator | |
| State | Louisiana[1][2] |
| Counties | Acadia, Evangeline[4] |
| Approved | 17 September 2020[1][4] |
| In service | October 2021[2] or 20 October 2021[3][sources disagree] |
| FERC docket | CP19-484[1] |
| Technical information | |
| Capacity | 894 MMcf/d (FERC project list)[1][2] |
| Units added | 3 × Solar Titan 250 (gas turbine)[5] |
| Cost | $143 million (EIA estimate; no dollar year given)[2] |
| On ProvenHand | |
| Hands listed | 0 |
Acadiana Project is a natural gas pipeline expansion in Louisiana, operated by Kinder Morgan Louisiana Pipeline LLC/Acadiana Project.
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Acadiana Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “Notice of Commencement of Service, Acadiana Project (CP19-484)”. Kinder Morgan Louisiana Pipeline LLC (filed with FERC). 21 October 2021. Retrieved 4 October 2026.
- “Order Issuing Certificate, Kinder Morgan Louisiana Pipeline LLC (CP19-484)”. Federal Energy Regulatory Commission. 17 September 2020. Retrieved 4 October 2026.
- “Request to place the Titan units in service, Acadiana Project (CP19-484)”. Kinder Morgan Louisiana Pipeline LLC (filed with FERC). 16 September 2021. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.