Accident Storage Filed Enhancement Project
From the ProvenHand pipeline wiki
Accident Storage Filed Enhancement Project is a natural gas facility project in Maryland, operated by Texas Eastern Transmission, LP. It runs 0.8 miles of 8" pipe.
| Accident Storage Filed Enhancement Project | |
|---|---|
| General information | |
| Kind | Facility project[1] |
| Status | In service[2] |
| Commodity | Natural gas[3] |
| Owner and operator | |
| State | Maryland[3] |
| Counties | Garrett[3] |
| Approved | 22 February 2006[3] |
| FERC docket | CP05-392[1] |
| Technical information | |
| Length | 0.8 mi[3] |
| Pipe size | 8"[3] |
| Capacity added | working gas capacity +3.0 Bcf (15.3 to 18.3 Bcf)[3] |
| Cost | $20,547,000[3] |
| On ProvenHand | |
| Hands listed | 0 |
Accident Storage Filed Enhancement Project is a natural gas facility project in Maryland, operated by Texas Eastern Transmission, LP. It runs 0.8 miles of 8" pipe.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Accident Storage Filed Enhancement Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP05-392”. Federal Energy Regulatory Commission. 6 July 2005. Retrieved 3 October 2026.
- “Notification that facilities at the Accident storage field have been placed into service (CP05-392)”. Federal Energy Regulatory Commission. 20 November 2008. Retrieved 4 October 2026.
- “Order issuing certificate, Texas Eastern Transmission (Accident Storage Enhancement Project, CP05-392)”. Federal Energy Regulatory Commission. 22 February 2006. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.