Adaline Compressor Station Horsepower Replacement
From the ProvenHand pipeline wiki
Adaline Compressor Station Horsepower Replacement is a natural gas facility project at Columbia Gas Transmission, LLC, Adaline Comp. Station in West Virginia, operated by Columbia Gas Transmission, LLC.
| Adaline Compressor Station Horsepower Replacement | |
|---|---|
| General information | |
| Kind | Facility project[1] |
| Project type | Rebuild[2] |
| Commodity | Natural gas[2] |
| Owner and operator | |
| Facility | Columbia Gas Transmission, LLC, Adaline Comp. Station[2] |
| State | West Virginia[1] |
| Counties | Marshall[2] |
| Approved | 12 March 2024[1] |
| FERC docket | CP24-41[2] |
| West Virginia stormwater permit | WVR312187[1] |
| Technical information | |
| Units added | 1 × CAT 3612/Ariel KBC-4 (3,750 hp each)[2] |
| Cost | $44 million[2] |
| On ProvenHand | |
| Hands listed | 0 |
Adaline Compressor Station Horsepower Replacement is a natural gas facility project at Columbia Gas Transmission, LLC, Adaline Comp. Station in West Virginia, operated by Columbia Gas Transmission, LLC.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Adaline Compressor Station Horsepower Replacement? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “WVDEP: Oil and Gas Construction Stormwater registrations”. West Virginia Department of Environmental Protection. Retrieved 3 October 2026.
- “Environmental Assessment Report, Section 2.55(b)(3) Advance Notification of Replacement of Facilities, Adaline Compressor Station (CP24-41)”. Federal Energy Regulatory Commission. 1 February 2024. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.