Adjustment to West-Central NCHP Pipeline Project

From the ProvenHand pipeline wiki

Adjustment to West-Central NCHP Pipeline Project is a natural gas pipeline replacement in Ohio, operated by Columbia Gas of Ohio. It runs 1 miles of 20" pipe.

Adjustment to West-Central NCHP Pipeline Project
General information
KindPipeline project[1]
Project typeReplacement[1]
StatusUnder construction[2]
CommodityNatural gas[1]
Owner and operator
StateOhio[3]
CountiesFranklin[1]
Ohio Power Siting Board case25-0809-GA-BLN[3]
Technical information
Length1 mi[1]
Pipe size20"[1]
Wall thickness0.375 in[1]
On ProvenHand
Hands listed0

Adjustment to West-Central NCHP Pipeline Project is a natural gas pipeline replacement in Ohio, operated by Columbia Gas of Ohio. It runs 1 miles of 20" pipe.

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Adjustment to West-Central NCHP Pipeline Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “Letter of Notification, Columbia Gas of Ohio, Inc., Adjustment to West-Central NCHP Pipeline Project, OPSB Case No. 25-0809-GA-BLN”. Columbia Gas of Ohio, Inc. (filed with the Ohio Power Siting Board; copy on columbiagasohio.com). 22 August 2025. Retrieved 3 October 2026.
  2. “PUCO Docketing Information System, case record and docket list for OPSB case 25-0809”. Public Utilities Commission of Ohio / Ohio Power Siting Board. Retrieved 3 October 2026.
  3. “PUCO Docketing Information System: gas cases, purpose BLN”. Public Utilities Commission of Ohio / Ohio Power Siting Board. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.