Aiken Compressor Expansion Project
From the ProvenHand pipeline wiki
Aiken Compressor Expansion Project is a natural gas pipeline expansion in South Carolina, operated by Carolina Gas Transmission, LLC. It was built and entered service in 2024. It runs 0.3 miles of 16" pipe.
| Aiken Compressor Expansion Project | |
|---|---|
| General information | |
| Project type | Expansion[1] |
| Status | In service[2] |
| Commodity | Natural gas[3] |
| Owner and operator | |
| State | South Carolina[3] |
| Counties | Aiken[3] |
| Approved | 5 December 2023[2] |
| Construction started | 11 March 2024[2] |
| In service | 1 October 2024[2] |
| FERC docket | CP23-549[1] |
| Technical information | |
| Length | 0.3 mi[3] |
| Pipe size | 16"[3] |
| Capacity added | 73,000 dekatherms per day[3] |
| Cost | $35,000,000 (cost stated in FERC staff EA)[3] |
| On ProvenHand | |
| Hands listed | 0 |
Aiken Compressor Expansion Project is a natural gas pipeline expansion in South Carolina, operated by Carolina Gas Transmission, LLC. It was built and entered service in 2024. It runs 0.3 miles of 16" pipe.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Aiken Compressor Expansion Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP23-549”. Federal Energy Regulatory Commission. 28 September 2023. Retrieved 3 October 2026.
- “Request for extension of time to file post-construction noise survey, Aiken Compressor Expansion Project (CP23-549)”. Carolina Gas Transmission, LLC (filed with FERC). 1 October 2025. Retrieved 3 October 2026.
- “Environmental Assessment Report, Aiken Compressor Expansion (ACE) Project (CP23-549)”. FERC. 5 December 2023. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.