AIRPORT II COMPRESSION is a natural gas pipeline in Alabama, operated by Gulf South Pipeline Company, LLC. It was built and entered service in 2011.

AIRPORT II COMPRESSION
General information
KindPipeline project[1] or Facility project[2][3][sources disagree]
Project typeExpansion[1] or Added units[2][3][sources disagree]
StatusIn service[1][4]
CommodityNatural gas[1]
Operator
Owner and operator
StateAlabama[1][2]
CountiesMobile[2][3]
Approved30 November 2010[4]
Construction started17 January 2011[6]
In service30 April 2011[1][4]
FERC docketCP10-502[1]
Technical information
Capacity54 MMcf/d additional capacity (EIA)[1]
Capacity addedan additional 54,000 Dth/d to Florida Gas Transmission during a maximum daily flow condition[4]
Horsepower added2,370 hp[4][7]
On ProvenHand
Hands listed0

AIRPORT II COMPRESSION is a natural gas pipeline in Alabama, operated by Gulf South Pipeline Company, LLC. It was built and entered service in 2011.

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Project type
Kind

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on AIRPORT II COMPRESSION? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  2. “FERC notice of request under blanket authorization, Airport II Compression Project (CP10-502)”. FERC. 29 September 2010. Retrieved 4 October 2026.
  3. “Gulf South Pipeline Company, LP; Notice of Request Under Blanket Authorization (Docket No. CP10-502-000), Federal Register 2010-24957”. Federal Energy Regulatory Commission (published in the Federal Register). 5 October 2010. Retrieved 4 October 2026.
  4. “Airport II Compression Project overview (Gulf South completed projects page, Wayback capture 2011-12-06)”. Gulf South Pipeline Company, LP. 2011. Archived from the original on 6 December 2011. Retrieved 4 October 2026.
  5. “FERC eLibrary docket CP10-502”. Federal Energy Regulatory Commission. 21 September 2010. Retrieved 3 October 2026.
  6. “Summary construction progress report, Airport II Compression Project (CP10-502)”. Gulf South Pipeline Company, LP (filed with FERC). 17 June 2011. Retrieved 4 October 2026.
  7. “Environmental Assessment Report, Airport II Compression Project (CP10-502)”. FERC. 19 November 2010. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.