Alabama Georgia Connector Project
From the ProvenHand pipeline wiki
Alabama Georgia Connector Project is a natural gas pipeline expansion in Alabama and Georgia, operated by Transcontinental Gas Pipe Line Company, LLC. Construction began in 2025.
| Alabama Georgia Connector Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Expansion[2] |
| Status | In service[2][3] |
| Commodity | Natural gas[2] |
| Owner and operator | |
| Facility projects | |
| States | Alabama, Georgia[2][4] |
| Counties | Alabama: Marengo, Randolph Georgia: Coweta, Henry, Walton[5] |
| Approved | 21 March 2024[4][5] |
| Construction started | 26 February 2025[6] |
| In service | October 2025[2] or 1 October 2025[3][sources disagree] |
| FERC docket | CP23-194[1] |
| Technical information | |
| Capacity | 63.8 MMcf/d (FERC project list)[2][4] |
| Capacity added | 63,800 Dth/d of firm transportation service[5] |
| Cost | $70.7 million (EIA estimate; no dollar year given)[2][5] |
| On ProvenHand | |
| Hands listed | 0 |
Alabama Georgia Connector Project is a natural gas pipeline expansion in Alabama and Georgia, operated by Transcontinental Gas Pipe Line Company, LLC. Construction began in 2025.
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Alabama Georgia Connector Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP23-194”. Federal Energy Regulatory Commission. 19 April 2023. Retrieved 3 October 2026.
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “Notification of Placement into Service and Commencement of Full Service, Alabama Georgia Connector Project (CP23-194)”. Transcontinental Gas Pipe Line Company, LLC (filed with FERC). 7 October 2025. Retrieved 3 October 2026.
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “Order Issuing Certificate and Approving Abandonment, Transcontinental Gas Pipe Line Company, LLC (CP23-194)”. Federal Energy Regulatory Commission. 21 March 2024. Retrieved 3 October 2026.
- “Notice of Commencement of Construction, Alabama Georgia Connector Project (CP23-194)”. Transcontinental Gas Pipe Line Company, LLC (filed with FERC). 4 March 2025. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.