Alabama Georgia Connector Project

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

Alabama Georgia Connector Project is a natural gas pipeline expansion in Alabama and Georgia, operated by Transcontinental Gas Pipe Line Company, LLC. Construction began in 2025.

Alabama Georgia Connector Project
General information
KindPipeline project[1]
Project typeExpansion[2]
StatusIn service[2][3]
CommodityNatural gas[2]
Owner and operator
Facility projects
StatesAlabama, Georgia[2][4]
CountiesAlabama: Marengo, Randolph
Georgia: Coweta, Henry, Walton
[5]
Approved21 March 2024[4][5]
Construction started26 February 2025[6]
In serviceOctober 2025[2] or 1 October 2025[3][sources disagree]
FERC docketCP23-194[1]
Technical information
Capacity63.8 MMcf/d (FERC project list)[2][4]
Capacity added63,800 Dth/d of firm transportation service[5]
Cost$70.7 million (EIA estimate; no dollar year given)[2][5]
On ProvenHand
Hands listed0

Alabama Georgia Connector Project is a natural gas pipeline expansion in Alabama and Georgia, operated by Transcontinental Gas Pipe Line Company, LLC. Construction began in 2025.

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
In service
  • October 2025[2]
  • 1 October 2025[3]

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Alabama Georgia Connector Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC eLibrary docket CP23-194”. Federal Energy Regulatory Commission. 19 April 2023. Retrieved 3 October 2026.
  2. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  3. “Notification of Placement into Service and Commencement of Full Service, Alabama Georgia Connector Project (CP23-194)”. Transcontinental Gas Pipe Line Company, LLC (filed with FERC). 7 October 2025. Retrieved 3 October 2026.
  4. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  5. “Order Issuing Certificate and Approving Abandonment, Transcontinental Gas Pipe Line Company, LLC (CP23-194)”. Federal Energy Regulatory Commission. 21 March 2024. Retrieved 3 October 2026.
  6. “Notice of Commencement of Construction, Alabama Georgia Connector Project (CP23-194)”. Transcontinental Gas Pipe Line Company, LLC (filed with FERC). 4 March 2025. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.