AlaTenn Pride Loop Project
From the ProvenHand pipeline wiki
AlaTenn Pride Loop Project is a natural gas pipeline loop in Alabama, operated by BBT Alatenn, LLC. Construction began in 2025. It runs 0.7 miles of 16" pipe.
| AlaTenn Pride Loop Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Loop[1] |
| Status | In service[2] |
| Commodity | Natural gas[3] |
| Owner and operator | |
| State | Alabama[3] |
| Counties | Colbert, Lawrence[3] |
| Approved | 6 December 2024[4] |
| Construction started | February 2025[4] |
| FERC docket | CP24-524[1] |
| Technical information | |
| Length | 0.7 mi[3] |
| Pipe size | 16"[3] |
| Cost | $4,241,541 (cost stated in FERC staff EA)[3] |
| On ProvenHand | |
| Hands listed | 0 |
AlaTenn Pride Loop Project is a natural gas pipeline loop in Alabama, operated by BBT Alatenn, LLC. Construction began in 2025. It runs 0.7 miles of 16" pipe.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on AlaTenn Pride Loop Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP24-524”. Federal Energy Regulatory Commission. 24 September 2024. Retrieved 3 October 2026.
- “Environmental Inspector's Weekly Status Report No. 19 (June 16 to 25, 2025), AlaTenn Pride Loop Project (CP24-524)”. BBT AlaTenn, LLC (filed with FERC). 25 June 2025. Retrieved 3 October 2026.
- “Environmental Assessment Report, AlaTenn Pride Loop Project (CP24-524)”. FERC. 3 December 2024. Retrieved 3 October 2026.
- “Weekly Status Report No. 1 (February 10 to 16, 2025), AlaTenn Pride Loop Project (CP24-524)”. BBT AlaTenn, LLC (filed with FERC). 19 February 2025. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.