AlaTenn Pride Loop Project is a natural gas pipeline loop in Alabama, operated by BBT Alatenn, LLC. Construction began in 2025. It runs 0.7 miles of 16" pipe.

AlaTenn Pride Loop Project
General information
KindPipeline project[1]
Project typeLoop[1]
StatusIn service[2]
CommodityNatural gas[3]
Owner and operator
StateAlabama[3]
CountiesColbert, Lawrence[3]
Approved6 December 2024[4]
Construction startedFebruary 2025[4]
FERC docketCP24-524[1]
Technical information
Length0.7 mi[3]
Pipe size16"[3]
Cost$4,241,541 (cost stated in FERC staff EA)[3]
On ProvenHand
Hands listed0

AlaTenn Pride Loop Project is a natural gas pipeline loop in Alabama, operated by BBT Alatenn, LLC. Construction began in 2025. It runs 0.7 miles of 16" pipe.

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on AlaTenn Pride Loop Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC eLibrary docket CP24-524”. Federal Energy Regulatory Commission. 24 September 2024. Retrieved 3 October 2026.
  2. “Environmental Inspector's Weekly Status Report No. 19 (June 16 to 25, 2025), AlaTenn Pride Loop Project (CP24-524)”. BBT AlaTenn, LLC (filed with FERC). 25 June 2025. Retrieved 3 October 2026.
  3. “Environmental Assessment Report, AlaTenn Pride Loop Project (CP24-524)”. FERC. 3 December 2024. Retrieved 3 October 2026.
  4. “Weekly Status Report No. 1 (February 10 to 16, 2025), AlaTenn Pride Loop Project (CP24-524)”. BBT AlaTenn, LLC (filed with FERC). 19 February 2025. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.