Alberta Xpress Project

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

Alberta Xpress Project is a natural gas pipeline expansion in Arkansas, Indiana, Kentucky, Louisiana, Michigan, Mississippi, Ohio and Tennessee, operated by TC Energy.

Alberta Xpress Project
General information
KindPipeline project[1]
Project typeExpansion[2]
StatusIn service[2][3]
CommodityNatural gas[2]
Operator
Owner and operator
StatesArkansas, Indiana, Kentucky, Louisiana, Michigan, Mississippi, Ohio, Tennessee[2]
CountiesEvangeline[5]
Approved21 April 2022[1][5]
In service11 January 2023[2] or 19 January 2023[3][sources disagree]
FERC docketCP20-484[1]
Technical information
Capacity165 MMcf/d (FERC project list)[1][2]
Cost$81.1 million (EIA estimate; no dollar year given)[2][5]
On ProvenHand
Hands listed0

Alberta Xpress Project is a natural gas pipeline expansion in Arkansas, Indiana, Kentucky, Louisiana, Michigan, Mississippi, Ohio and Tennessee, operated by TC Energy.

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
In service
  • 11 January 2023[2]
  • 19 January 2023[3]

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Alberta Xpress Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  2. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  3. “Notice of Commencement of Service, Alberta XPress Project (CP20-484)”. ANR Pipeline Company (filed with FERC). 20 January 2023. Retrieved 4 October 2026.
  4. “FERC eLibrary docket CP20-484”. Federal Energy Regulatory Commission. 22 June 2020. Retrieved 3 October 2026.
  5. “Order Issuing Certificate and Approving Abandonment, ANR Pipeline Company and Great Lakes Gas Transmission Limited Partnership (CP20-484, CP20-485)”. Federal Energy Regulatory Commission. 21 April 2022. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.