Alberta Xpress Project
From the ProvenHand pipeline wiki
Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.
Alberta Xpress Project is a natural gas pipeline expansion in Arkansas, Indiana, Kentucky, Louisiana, Michigan, Mississippi, Ohio and Tennessee, operated by TC Energy.
| Alberta Xpress Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Expansion[2] |
| Status | In service[2][3] |
| Commodity | Natural gas[2] |
| Operator | |
| Owner and operator | |
| States | Arkansas, Indiana, Kentucky, Louisiana, Michigan, Mississippi, Ohio, Tennessee[2] |
| Counties | Evangeline[5] |
| Approved | 21 April 2022[1][5] |
| In service | 11 January 2023[2] or 19 January 2023[3][sources disagree] |
| FERC docket | CP20-484[1] |
| Technical information | |
| Capacity | 165 MMcf/d (FERC project list)[1][2] |
| Cost | $81.1 million (EIA estimate; no dollar year given)[2][5] |
| On ProvenHand | |
| Hands listed | 0 |
Alberta Xpress Project is a natural gas pipeline expansion in Arkansas, Indiana, Kentucky, Louisiana, Michigan, Mississippi, Ohio and Tennessee, operated by TC Energy.
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Alberta Xpress Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “Notice of Commencement of Service, Alberta XPress Project (CP20-484)”. ANR Pipeline Company (filed with FERC). 20 January 2023. Retrieved 4 October 2026.
- “FERC eLibrary docket CP20-484”. Federal Energy Regulatory Commission. 22 June 2020. Retrieved 3 October 2026.
- “Order Issuing Certificate and Approving Abandonment, ANR Pipeline Company and Great Lakes Gas Transmission Limited Partnership (CP20-484, CP20-485)”. Federal Energy Regulatory Commission. 21 April 2022. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.