Alexandria Compressor Station Replacement
From the ProvenHand pipeline wiki
Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.
Alexandria Compressor Station Replacement is a natural gas facility project in Louisiana.
| Alexandria Compressor Station Replacement | |
|---|---|
| General information | |
| Kind | Facility project[1] |
| Project type | Rebuild[2] |
| Status | Approved[1] |
| Commodity | Natural gas[1] |
| Owner and operator | |
| Operator | |
| State | Louisiana[1] |
| Counties | Rapides[1] |
| FERC docket | CP14-479[2] |
| Technical information | |
| Units added | 1 × Solar Titan 130 (gas turbine); 1 × Solar Mars 90 (gas turbine)[1] |
| Cost | $73,000,000[1] |
| On ProvenHand | |
| Hands listed | 0 |
Alexandria Compressor Station Replacement is a natural gas facility project in Louisiana.
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Alexandria Compressor Station Replacement? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “Environmental Assessment Report, Alexandria Compressor Station replacement, Columbia Gulf Transmission, LLC (CP14-479)”. FERC. 4 June 2014. Retrieved 4 October 2026.
- “FERC eLibrary docket CP14-479”. Federal Energy Regulatory Commission. 7 May 2014. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.