Allegheny Storage Project

From the ProvenHand pipeline wiki

Allegheny Storage Project is a pipeline project in Maryland, Ohio and Pennsylvania, operated by Dominion Transmission, Inc.. It entered service in 2014. It runs 3.1 miles.

Allegheny Storage Project
General information
KindPipeline project[1]
StatusIn service[2]
Owner and operator
Facility projects
StatesMaryland, Ohio, Pennsylvania[1]
CountiesMaryland: Frederick
Ohio: Monroe

Pennsylvania: Tioga

West Virginia: Lewis
[3]
Approved20 December 2012[1]
In service1 November 2014[2]
FERC docketCP12-72[1]
FERC pre-filing docketPF11-9[1]
Technical information
Length3.1 mi[1]
Capacity125 MMcf/d (FERC project list)[1]
On ProvenHand
Hands listed0

Allegheny Storage Project is a pipeline project in Maryland, Ohio and Pennsylvania, operated by Dominion Transmission, Inc.. It entered service in 2014. It runs 3.1 miles.

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Allegheny Storage Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  2. “Notification of In-Service (replacement filing), Allegheny Storage Project (CP12-72)”. Dominion Transmission, Inc. (filed with FERC). 10 November 2014. Retrieved 4 October 2026.
  3. “Implementation Plan, Allegheny Storage Project (CP12-72)”. Dominion Transmission, Inc. (filed with FERC). 15 February 2013. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.