Allegheny Storage Project
From the ProvenHand pipeline wiki
Allegheny Storage Project is a pipeline project in Maryland, Ohio and Pennsylvania, operated by Dominion Transmission, Inc.. It entered service in 2014. It runs 3.1 miles.
| Allegheny Storage Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Status | In service[2] |
| Owner and operator | |
| Facility projects | |
| States | Maryland, Ohio, Pennsylvania[1] |
| Counties | Maryland: Frederick Ohio: Monroe Pennsylvania: Tioga West Virginia: Lewis[3] |
| Approved | 20 December 2012[1] |
| In service | 1 November 2014[2] |
| FERC docket | CP12-72[1] |
| FERC pre-filing docket | PF11-9[1] |
| Technical information | |
| Length | 3.1 mi[1] |
| Capacity | 125 MMcf/d (FERC project list)[1] |
| On ProvenHand | |
| Hands listed | 0 |
Allegheny Storage Project is a pipeline project in Maryland, Ohio and Pennsylvania, operated by Dominion Transmission, Inc.. It entered service in 2014. It runs 3.1 miles.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Allegheny Storage Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “Notification of In-Service (replacement filing), Allegheny Storage Project (CP12-72)”. Dominion Transmission, Inc. (filed with FERC). 10 November 2014. Retrieved 4 October 2026.
- “Implementation Plan, Allegheny Storage Project (CP12-72)”. Dominion Transmission, Inc. (filed with FERC). 15 February 2013. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.