Altamont Green River Pipeline Project

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

Altamont Green River Pipeline Project is a natural gas pipeline in Utah, operated by Kinder Morgan Altamont LLC.

Altamont Green River Pipeline Project
General information
KindPipeline project[1]
Project typeNew build[1]
StatusIn service[1]
CommodityNatural gas[1]
Operator
StateUtah[1]
In serviceSeptember 2025[1][2] or July 2025[3][sources disagree]
Technical information
Length44.5 mi[1] or 43 mi[4] or 50 mi[3][sources disagree]
Pipe size20"[1][4]
Capacity150 MMcf/d additional capacity (EIA)[1][2]
Cost$263 million (EIA estimate; no dollar year given)[1][2]
On ProvenHand
Hands listed0

Altamont Green River Pipeline Project is a natural gas pipeline in Utah, operated by Kinder Morgan Altamont LLC.

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
In service
Length

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Altamont Green River Pipeline Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  2. “Kinder Morgan, Inc. third quarter 2025 results (Form 8-K exhibit 99.1)”. Kinder Morgan, Inc. (SEC Form 8-K exhibit). 22 October 2025. Retrieved 3 October 2026.
  3. “Kinder Morgan natural gas pipelines, North Midstream: Green River Pipeline”. Kinder Morgan (operator web page). Retrieved 3 October 2026.
  4. “Kinder Morgan, Inc. second quarter 2024 results (Form 8-K exhibit 99.1)”. Kinder Morgan, Inc. (SEC Form 8-K exhibit). 17 July 2024. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.