Texas Connector Amendment Project

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

Texas Connector Amendment Project is a pipeline project in Louisiana and Texas, operated by Texas Connector Pipeline, LLC.

Texas Connector Amendment Project
Also calledTexas Connector Project[1]
General information
KindPipeline project[1]
StatusApproved[2]
Owner and operator
Part ofTexas Connector-Port Arthur Pipeline[4]
Facility project
StatesLouisiana, Texas[3]
Approved26 June 2025[3][5]
FERC docketCP24-512[1]
Technical information
Pipe size36", 42"[4]
Capacity488 MMcf/d (FERC project list)[3] or could deliver about 2,000,000 Dth/d to the Port Arthur LNG terminal[4][sources disagree]
On ProvenHand
Hands listed0

Texas Connector Amendment Project is a pipeline project in Louisiana and Texas, operated by Texas Connector Pipeline, LLC.

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Capacity
  • 488 MMcf/d (FERC project list)[3]
  • could deliver about 2,000,000 Dth/d to the Port Arthur LNG terminal[4]

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Texas Connector Amendment Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC eLibrary docket CP24-512”. Federal Energy Regulatory Commission. 12 August 2024. Retrieved 3 October 2026.
  2. “Quarterly Construction Status Report No. 9 (July-September 2026), Texas Connector Project (CP17-21)”. Texas Connector Pipeline, LLC (filed with FERC). 1 October 2026. Retrieved 4 October 2026.
  3. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  4. “Environmental Assessment, Texas Connector Amendment Project (CP24-512)”. FERC staff. 21 March 2025. Retrieved 4 October 2026.
  5. “Order Approving Amendment, Texas Connector Pipeline, LLC (CP24-512)”. FERC (order). 26 June 2025. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.