Ameren – EMRT Castle Bluff Project is a natural gas pipeline replacement in Missouri, operated by Enable Mississippi River Transmission, LLC. Construction began in 2026. It runs 1.6 miles of 20" pipe.
| Ameren – EMRT Castle Bluff Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Replacement[1][2] |
| Status | Under construction[3] |
| Commodity | Natural gas[2] |
| Owner and operator | |
| State | Missouri[2] |
| Counties | Jefferson, St. Louis[2] |
| Approved | 11 February 2026[4] |
| Construction started | 10 March 2026[4] |
| FERC docket | CP26-30[1] |
| Technical information | |
| Length | 1.6 mi[2] |
| Pipe size | 20"[2] |
| Capacity added | up to 188 million standard cubic feet per day[2] |
| Cost | $17,208,248 (cost stated in FERC staff EA)[2] |
| On ProvenHand | |
| Hands listed | 0 |
Ameren – EMRT Castle Bluff Project is a natural gas pipeline replacement in Missouri, operated by Enable Mississippi River Transmission, LLC. Construction began in 2026. It runs 1.6 miles of 20" pipe.
Crossings
| Feature | Method |
|---|---|
| Meramec River[2] | HDD |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Ameren – EMRT Castle Bluff Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP26-30”. Federal Energy Regulatory Commission. 21 November 2025. Retrieved 3 October 2026.
- “Environmental Assessment Report, Ameren - EMRT Castle Bluff Project (CP26-30)”. FERC. 11 February 2026. Retrieved 3 October 2026.
- “Weekly Environmental Status Report No. 28 (September 13 to 19, 2026), Ameren-EMRT Castle Bluff Project (CP26-30)”. Enable Mississippi River Transmission, LLC (filed with FERC). 1 October 2026. Retrieved 3 October 2026.
- “Weekly Environmental Status Report No. 1 (March 9 to 14, 2026), Ameren - EMRT Castle Bluff Project (CP26-30)”. Enable Mississippi River Transmission, LLC (filed with FERC). 20 March 2026. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.