ANR Wisconsin Project Expansion

From the ProvenHand pipeline wiki

ANR Wisconsin Project Expansion is a natural gas pipeline expansion in Wisconsin, operated by ANR Pipeline Company. It entered service in 2010. It runs 8.9 miles of 30" pipe.

ANR Wisconsin Project Expansion
Also calledWisconsin 2009 Expansion Project[1]
General information
KindPipeline project[2]
Project typeExpansion[1][2]
StatusIn service[2][3]
CommodityNatural gas[2]
Operator
Owner and operator
StateWisconsin[2]
Approved24 August 2009[4]
In service28 October 2010[2][3]
FERC docketCP08-465[2]
Technical information
Length8.9 mi[2]
Pipe size30"[2]
Capacity97.9 MMcf/d additional capacity (EIA)[2]
Cost$38.3 million (EIA estimate; no dollar year given)[2]
On ProvenHand
Hands listed0

ANR Wisconsin Project Expansion is a natural gas pipeline expansion in Wisconsin, operated by ANR Pipeline Company. It entered service in 2010. It runs 8.9 miles of 30" pipe.

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on ANR Wisconsin Project Expansion? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC eLibrary docket CP08-465”. Federal Energy Regulatory Commission. 20 August 2008. Retrieved 3 October 2026.
  2. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  3. “Wisconsin 2009 Expansion Project Notice of Commencement of Service (CP08-465)”. ANR Pipeline Company (filed with FERC). 3 November 2010. Retrieved 4 October 2026.
  4. “Order Issuing Certificate of public convenience and necessity re ANR Pipeline Company (CP08-465), eLibrary filing description”. FERC. 24 August 2009. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.