Appalachia to Market II & Armagh & Entriken HP Replacement Project
From the ProvenHand pipeline wiki
Appalachia to Market II & Armagh & Entriken HP Replacement Project is a natural gas pipeline replacement in New Jersey and Pennsylvania, operated by Texas Eastern Transmission, LP. Construction began in 2024. It runs 2 miles of 36" pipe.
| Appalachia to Market II & Armagh & Entriken HP Replacement Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Replacement[1][2] |
| Status | Under construction[2][3] |
| Commodity | Natural gas[2] |
| Owner and operator | |
| Facility projects | |
| States | New Jersey, Pennsylvania[2][4] |
| Counties | Huntingdon, Indiana, Lebanon[5] |
| Approved | 23 October 2023[4][5] |
| Construction started | March 2024[6] |
| FERC docket | CP22-486[1] |
| Technical information | |
| Length | 2 mi[2][4][5] |
| Pipe size | 36"[2][5] |
| Capacity | 55 MMcf/d (FERC project list)[2][4] |
| Cost | $368 million (EIA estimate; no dollar year given)[2] or $368,729,684 estimated total cost of the projects (certificate order)[5][sources disagree] |
| On ProvenHand | |
| Hands listed | 0 |
Appalachia to Market II & Armagh & Entriken HP Replacement Project is a natural gas pipeline replacement in New Jersey and Pennsylvania, operated by Texas Eastern Transmission, LP. Construction began in 2024. It runs 2 miles of 36" pipe.
Spreads
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
| Fact | Values given |
|---|---|
| Cost |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Appalachia to Market II & Armagh & Entriken HP Replacement Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP22-486”. Federal Energy Regulatory Commission. 7 July 2022. Retrieved 3 October 2026.
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “Biweekly Status Report No. 67 (Aug 22 to Sep 4, 2026), Appalachia to Market II and Armagh and Entriken HP Replacement Projects (CP22-486)”. Texas Eastern Transmission, LP (filed with FERC). 22 September 2026. Retrieved 3 October 2026.
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “Order Issuing Certificate and Approving Abandonment, Appalachia to Market II and Armagh and Entriken HP Replacement Projects (CP22-486)”. Federal Energy Regulatory Commission. 23 October 2023. Retrieved 3 October 2026.
- “Biweekly Status Report No. 2 (Feb 23 to Mar 8, 2024), Appalachia to Market II and Armagh and Entriken HP Replacement Projects (CP22-486)”. Texas Eastern Transmission, LP (filed with FERC). 14 March 2024. Retrieved 3 October 2026.
- “Implementation Plan and Request for Notice to Proceed, Appalachia to Market II and Armagh and Entriken HP Replacement Projects (CP22-486)”. Texas Eastern Transmission, LP (filed with FERC). 31 October 2023. Retrieved 3 October 2026.
- “Biweekly Status Report No. 29 (Mar 8 to Mar 21, 2025), Appalachia to Market II and Armagh and Entriken HP Replacement Projects (CP22-486)”. Texas Eastern Transmission, LP (filed with FERC). 31 March 2025. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.