Appalachian Lease Project (TEAL) Phase 2
From the ProvenHand pipeline wiki
Appalachian Lease Project (TEAL) Phase 2 is a natural gas pipeline lateral in Ohio, operated by Texas Eastern Transmission, LP. It entered service in 2019.
| Appalachian Lease Project (TEAL) Phase 2 | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Lateral[1] |
| Status | In service[1] |
| Commodity | Natural gas[1] |
| Operator | |
| State | Ohio[1] |
| Approved | 25 August 2017[2] |
| In service | April 2019[1] |
| FERC docket | CP16-23[1] |
| FERC pre-filing docket | PF15-11[1] |
| Technical information | |
| Capacity | 312.596 MMcf/d additional capacity (EIA)[1] |
| On ProvenHand | |
| Hands listed | 0 |
Appalachian Lease Project (TEAL) Phase 2 is a natural gas pipeline lateral in Ohio, operated by Texas Eastern Transmission, LP. It entered service in 2019.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Appalachian Lease Project (TEAL) Phase 2? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “Order issuing certificate(s), docket CP16-23: Order Issuing Certificates and Granting Abandonment re the NEXUS Gas Transmission, LLC et”. Federal Energy Regulatory Commission. 25 August 2017. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.