Appalachian Reliability Project

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

Appalachian Reliability Project is a natural gas pipeline expansion in Ohio and Pennsylvania, operated by Eastern Gas Transmission and Storage, Inc.. It runs 3.9 miles.

Appalachian Reliability Project
General information
KindPipeline project[1]
Project typeExpansion[2]
StatusApproved[2][3]
CommodityNatural gas[2]
Owners and operators
StatesOhio, Pennsylvania[2][4][5]
CountiesOhio: Monroe
Pennsylvania: Armstrong, Greene, Westmoreland
[3]
Approved18 June 2026[3][4]
FERC docketCP25-528[1]
Technical information
Length3.9 mi[2][4][5]
Capacity550 MMcf/d (FERC project list)[2][4][5] or up to 550,000 Dth/d of incremental firm transportation service[3][sources disagree]
Units added1 × Solar Taurus 70 (gas turbine); 1 × Solar Titan 130 (gas turbine)[3]
Costapproximately $239 million[3]
On ProvenHand
Hands listed0

Appalachian Reliability Project is a natural gas pipeline expansion in Ohio and Pennsylvania, operated by Eastern Gas Transmission and Storage, Inc.. It runs 3.9 miles.

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Capacity
  • 550 MMcf/d (FERC project list)[2][4][5]
  • up to 550,000 Dth/d of incremental firm transportation service[3]

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Appalachian Reliability Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC eLibrary docket CP25-528”. Federal Energy Regulatory Commission. 24 July 2025. Retrieved 3 October 2026.
  2. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  3. “Order Issuing Certificate, Appalachian Reliability Project (CP25-528)”. Federal Energy Regulatory Commission. 18 June 2026. Retrieved 4 October 2026.
  4. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  5. “FERC: Major Pipeline Projects Pending (Onshore)”. Federal Energy Regulatory Commission. Archived from the original on 20 December 2025. Retrieved 3 October 2026.