Arsenal Hill Project is a natural gas pipeline in Louisiana, operated by Centerpoint Energy Gas Transmission. Construction began in 2009. It runs 5.6 miles of 16" pipe.

Arsenal Hill Project
General information
KindPipeline project[1]
CommodityNatural gas[2]
Owner and operator
StateLouisiana[2]
CountiesCaddo[2]
Construction started22 June 2009[4]
FERC docketCP09-89[3]
Technical information
Length5.6 mi[2]
Pipe size16"[2]
Capacitycapacity of 80,000 Dth/d[2]
Cost$15.0 million[2]
On ProvenHand
Hands listed0

Arsenal Hill Project is a natural gas pipeline in Louisiana, operated by Centerpoint Energy Gas Transmission. Construction began in 2009. It runs 5.6 miles of 16" pipe.

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Arsenal Hill Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “Environmental Comments, CenterPoint Energy Gas Transmission Company's Arsenal Hill Project (CP09-89)”. FERC. 18 May 2009. Retrieved 4 October 2026.
  2. “Notice of request under blanket authorization, CenterPoint Energy Gas Transmission Company (CP09-89)”. FERC. 8 April 2009. Retrieved 4 October 2026.
  3. “FERC eLibrary docket CP09-89”. Federal Energy Regulatory Commission. 26 March 2009. Retrieved 3 October 2026.
  4. “Environmental Inspector's weekly report for the period ending 12/06/2009, Arsenal Hill Project, CenterPoint Energy Gas Transmission Company (CP09-89)”. CenterPoint Energy Gas Transmission Company (filed with FERC). 7 December 2009. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.