Athens Optimization Project
From the ProvenHand pipeline wiki
Athens Optimization Project is a natural gas facility project in Ohio, operated by Texas Eastern Transmission, LP.
| Athens Optimization Project | |
|---|---|
| General information | |
| Kind | Facility project[1] |
| Project type | Rebuild[1][2] |
| Status | Proposed[3][4] |
| Commodity | Natural gas[2] |
| Owner and operator | |
| State | Ohio[2] |
| Counties | Athens[2] |
| FERC docket | CP26-175[1] |
| Technical information | |
| Capacity added | 50,000 Dth/d of incremental firm transportation capacity[5] |
| Units added | 2 × Solar Turbines Titan 130 (gas turbine, 18,100 hp each)[5] |
| Horsepower added | 4,200 hp[2] |
| Cost | $223,033,746 (Texas Eastern estimate, April 2026 application)[2] |
| On ProvenHand | |
| Hands listed | 0 |
Athens Optimization Project is a natural gas facility project in Ohio, operated by Texas Eastern Transmission, LP.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Athens Optimization Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP26-175”. Federal Energy Regulatory Commission. 1 April 2026. Retrieved 3 October 2026.
- “Notice of Application and Establishing Intervention Deadline, Athens Optimization Project (CP26-175-000)”. Federal Energy Regulatory Commission. 14 April 2026. Retrieved 3 October 2026.
- “Notice of Scoping Period Requesting Comments on Environmental Issues for the Proposed Athens Optimization Project (CP26-175-000)”. Federal Energy Regulatory Commission. 13 May 2026. Retrieved 3 October 2026.
- “Athens Optimization Project”. Enbridge Inc. Retrieved 3 October 2026.
- “Abbreviated Application for a Certificate of Public Convenience and Necessity, Athens Optimization Project”. Texas Eastern Transmission, LP (filed with FERC). 1 April 2026. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.