B System Project is a natural gas pipeline replacement in Ohio, operated by Columbia Gas Transmission, LLC. It entered service in 2018.
| B System Project | |
|---|---|
| General information | |
| Project type | Replacement[1] |
| Status | In service[2] |
| Commodity | Natural gas[3] |
| Owner and operator | |
| State | Ohio[3] |
| Counties | Fairfield, Franklin[3] |
| Approved | 20 November 2017[3] |
| In service | 26 October 2018[2] |
| FERC docket | CP16-498[1] |
| FERC pre-filing docket | PF16-4[1] |
| Technical information | |
| Pipe size | 4", 20"[3] |
| Cost | approximately $182.8 million[3] |
| On ProvenHand | |
| Hands listed | 0 |
B System Project is a natural gas pipeline replacement in Ohio, operated by Columbia Gas Transmission, LLC. It entered service in 2018.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on B System Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP16-498”. Federal Energy Regulatory Commission. 9 September 2016. Retrieved 3 October 2026.
- “Line K-270 notice of commencement of service and affirmative statement, B System Project (CP16-498)”. Federal Energy Regulatory Commission (eLibrary filing). 31 October 2018. Retrieved 4 October 2026.
- “Order approving abandonment and issuing certificate, Columbia Gas Transmission, LLC (CP16-498)”. Federal Energy Regulatory Commission (eLibrary filing). 20 November 2017. Retrieved 4 October 2026.