Barilla Draw Crude Oil Pipeline Lateral
From the ProvenHand pipeline wiki
Barilla Draw Crude Oil Pipeline Lateral is a crude oil pipeline in Texas.
| Barilla Draw Crude Oil Pipeline Lateral | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Commodity | Crude oil[1] |
| Owner | |
| State | Texas[1] |
| Contractors | |
| Technical information | |
| Pipe size | 16"[1] |
| On ProvenHand | |
| Hands listed | 0 |
Barilla Draw Crude Oil Pipeline Lateral is a crude oil pipeline in Texas.
Contractorsedit
| Contractor | Work | Scope |
|---|---|---|
| Pumpco, Inc.[1] | Prime | IIR listing: Plains All American with Pumpco (G/C Phase I: 20 miles of 16-inch, south of Pecos, TX to the Barstow pump station) and Venable's Construction (Phase II: 28 miles Barstow to Wink, from Apr 2015); completion Sep 2015 |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Barilla Draw Crude Oil Pipeline Lateral? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “Industrial Info Resources project report on the Whistler grassroot natural gas pipeline (Exhibit GPLDC-1b, South Dakota PUC docket HP22-001)”. Industrial Info Resources (as filed with the South Dakota Public Utilities Commission). 2023. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.