Bayou Bridge Pipeline (Phase 1, Nederland to Lake Charles)

From the ProvenHand pipeline wiki

Bayou Bridge Pipeline (Phase 1, Nederland to Lake Charles) is a crude oil pipeline in Texas and Louisiana, operated by Sunoco Logistics. Construction began in 2015 and the line entered service in 2016. It runs 49 miles of 30" pipe.[1]

Bayou Bridge Pipeline (Phase 1, Nederland to Lake Charles)
Also calledBayou Bridge, Bayou Bridge Phase I, BBP
General information
CommodityCrude oil
OperatorSunoco Logistics
StatesTexas, Louisiana
Construction started2015
In service2016
Technical information
Length49 mi
Pipe size30"
On ProvenHand
Hands listed0

Bayou Bridge Pipeline (Phase 1, Nederland to Lake Charles) is a crude oil pipeline in Texas and Louisiana, operated by Sunoco Logistics. Construction began in 2015 and the line entered service in 2016. It runs 49 miles of 30" pipe.[1]

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Bayou Bridge Pipeline (Phase 1, Nederland to Lake Charles)? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. worldpipelines.com
  2. unitholder.phillips66partners.com
  3. businesswire.com

This pipeline article is a stub. You can help ProvenHand by expanding it.