Bayou Bridge Pipeline (Phase 1, Nederland to Lake Charles)
From the ProvenHand pipeline wiki
Bayou Bridge Pipeline (Phase 1, Nederland to Lake Charles) is a crude oil pipeline in Texas and Louisiana, operated by Sunoco Logistics. Construction began in 2015 and the line entered service in 2016. It runs 49 miles of 30" pipe.[1]
| Bayou Bridge Pipeline (Phase 1, Nederland to Lake Charles) | |
|---|---|
| Also called | Bayou Bridge, Bayou Bridge Phase I, BBP |
| General information | |
| Commodity | Crude oil |
| Operator | Sunoco Logistics |
| States | Texas, Louisiana |
| Construction started | 2015 |
| In service | 2016 |
| Technical information | |
| Length | 49 mi |
| Pipe size | 30" |
| On ProvenHand | |
| Hands listed | 0 |
Bayou Bridge Pipeline (Phase 1, Nederland to Lake Charles) is a crude oil pipeline in Texas and Louisiana, operated by Sunoco Logistics. Construction began in 2015 and the line entered service in 2016. It runs 49 miles of 30" pipe.[1]
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Bayou Bridge Pipeline (Phase 1, Nederland to Lake Charles)? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
This pipeline article is a stub. You can help ProvenHand by expanding it.