Bayway Lateral Project

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

Bayway Lateral Project is a natural gas pipeline lateral in New Jersey, operated by Texas Eastern Transmission, LP. Construction began in 2017.

Bayway Lateral Project
General information
KindPipeline project[1]
Project typeLateral[2][3]
StatusIn service[2]
CommodityNatural gas[2]
Owner and operator
StateNew Jersey[1][2]
CountiesUnion[4]
Approved3 July 2017[1][4]
Construction started11 August 2017[5]
In service3 January 2018[2] or 22 December 2017[6][sources disagree]
FERC docketCP16-473[1]
Contractors
Technical information
Length0.4 mi[1] or 1 mi[2][sources disagree]
Pipe size24"[2][4]
Capacity300 MMcf/d (FERC project list)[1][2]
Cost$31 million (EIA estimate; no dollar year given)[2] or $25,326,128 post-construction forecast (Jun 2018); Exhibit K estimate $30,867,969[7][sources disagree]
On ProvenHand
Hands listed0

Bayway Lateral Project is a natural gas pipeline lateral in New Jersey, operated by Texas Eastern Transmission, LP. Construction began in 2017.

Contractorsedit

ContractorWorkScopeYears
U.S. Pipeline, Inc.[8]Prime2,250 feet of 42-inch pipe under the New Jersey Turnpike and a new meter and regulator station1 January 2017

Crossings

FeatureMethod
PSEG Power Linden Generating Station, Bayway Refinery landfill, railroad tracks and the New Jersey Turnpike[7][9]HDD

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Cost
  • $31 million (EIA estimate; no dollar year given)[2]
  • $25,326,128 post-construction forecast (Jun 2018); Exhibit K estimate $30,867,969[7]
In service
  • 3 January 2018[2]
  • 22 December 2017[6]
Length

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Bayway Lateral Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  2. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  3. “FERC eLibrary docket CP16-473”. Federal Energy Regulatory Commission. 29 June 2016. Retrieved 3 October 2026.
  4. “Order Issuing Certificate, Texas Eastern Transmission, LP, Bayway Lateral Project (CP16-473)”. Federal Energy Regulatory Commission. 3 July 2017. Retrieved 3 October 2026.
  5. “Weekly status report no. 4 (week ending August 12, 2017), Bayway Lateral Project (CP16-473)”. Texas Eastern Transmission, LP (filed with FERC). 21 August 2017. Retrieved 3 October 2026.
  6. “Notice of Commencement of Service, Bayway Lateral Project (CP16-473)”. Texas Eastern Transmission, LP (filed with FERC). 2 January 2018. Retrieved 3 October 2026.
  7. “Post-construction statement of costs, Bayway Lateral Project (CP16-473)”. Texas Eastern Transmission, LP (filed with FERC). 22 June 2018. Retrieved 3 October 2026.
  8. “Recent Projects - U.S. Pipeline (project map)”. U.S. Pipeline, Inc. Retrieved 3 October 2026.
  9. “Environmental Assessment, Bayway Lateral Project (CP16-473)”. Federal Energy Regulatory Commission. 23 November 2016. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.