Bayway Lateral Project
From the ProvenHand pipeline wiki
Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.
Bayway Lateral Project is a natural gas pipeline lateral in New Jersey, operated by Texas Eastern Transmission, LP. Construction began in 2017.
| Bayway Lateral Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Lateral[2][3] |
| Status | In service[2] |
| Commodity | Natural gas[2] |
| Owner and operator | |
| State | New Jersey[1][2] |
| Counties | Union[4] |
| Approved | 3 July 2017[1][4] |
| Construction started | 11 August 2017[5] |
| In service | 3 January 2018[2] or 22 December 2017[6][sources disagree] |
| FERC docket | CP16-473[1] |
| Contractors | |
| Technical information | |
| Length | 0.4 mi[1] or 1 mi[2][sources disagree] |
| Pipe size | 24"[2][4] |
| Capacity | 300 MMcf/d (FERC project list)[1][2] |
| Cost | $31 million (EIA estimate; no dollar year given)[2] or $25,326,128 post-construction forecast (Jun 2018); Exhibit K estimate $30,867,969[7][sources disagree] |
| On ProvenHand | |
| Hands listed | 0 |
Bayway Lateral Project is a natural gas pipeline lateral in New Jersey, operated by Texas Eastern Transmission, LP. Construction began in 2017.
Contractorsedit
| Contractor | Work | Scope | Years |
|---|---|---|---|
| U.S. Pipeline, Inc.[8] | Prime | 2,250 feet of 42-inch pipe under the New Jersey Turnpike and a new meter and regulator station | 1 January 2017 |
Crossings
| Feature | Method |
|---|---|
| PSEG Power Linden Generating Station, Bayway Refinery landfill, railroad tracks and the New Jersey Turnpike[7][9] | HDD |
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
| Fact | Values given |
|---|---|
| Cost | |
| In service | |
| Length |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Bayway Lateral Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “FERC eLibrary docket CP16-473”. Federal Energy Regulatory Commission. 29 June 2016. Retrieved 3 October 2026.
- “Order Issuing Certificate, Texas Eastern Transmission, LP, Bayway Lateral Project (CP16-473)”. Federal Energy Regulatory Commission. 3 July 2017. Retrieved 3 October 2026.
- “Weekly status report no. 4 (week ending August 12, 2017), Bayway Lateral Project (CP16-473)”. Texas Eastern Transmission, LP (filed with FERC). 21 August 2017. Retrieved 3 October 2026.
- “Notice of Commencement of Service, Bayway Lateral Project (CP16-473)”. Texas Eastern Transmission, LP (filed with FERC). 2 January 2018. Retrieved 3 October 2026.
- “Post-construction statement of costs, Bayway Lateral Project (CP16-473)”. Texas Eastern Transmission, LP (filed with FERC). 22 June 2018. Retrieved 3 October 2026.
- “Recent Projects - U.S. Pipeline (project map)”. U.S. Pipeline, Inc. Retrieved 3 October 2026.
- “Environmental Assessment, Bayway Lateral Project (CP16-473)”. Federal Energy Regulatory Commission. 23 November 2016. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.