Bessemer Calera Expansion Project

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

Bessemer Calera Expansion Project is a natural gas pipeline expansion in Alabama. Construction began in 2024 and the line entered service in 2025. It runs 4.1 miles of 4", 12" pipe.

Bessemer Calera Expansion Project
General information
KindPipeline project[1]
Project typeExpansion[1][2]
StatusIn service[3]
CommodityNatural gas[4]
Owners and operators
StateAlabama[4]
CountiesJefferson, Perry, Shelby[4]
Construction started18 March 2024[6]
In service2025[3]
FERC docketsCP24-32[5], CP24-470[2], CP25-6[1]
Technical information
Length4.1 mi[4]
Pipe size4", 12"[4]
Cost$25,000,000 (cost stated in FERC staff EA)[4]
On ProvenHand
Hands listed0

Bessemer Calera Expansion Project is a natural gas pipeline expansion in Alabama. Construction began in 2024 and the line entered service in 2025. It runs 4.1 miles of 4", 12" pipe.

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Operator

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Bessemer Calera Expansion Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC eLibrary docket CP25-6”. Federal Energy Regulatory Commission. 15 October 2024. Retrieved 3 October 2026.
  2. “FERC eLibrary docket CP24-470”. Federal Energy Regulatory Commission. 24 May 2024. Retrieved 3 October 2026.
  3. “Weekly Status Report No. 46 (January 28 to February 4, 2025), Bessemer Calera Expansion Project (CP24-32 and CP25-6)”. Southern Natural Gas Company, L.L.C. (filed with FERC). 19 February 2025. Retrieved 3 October 2026.
  4. “Environmental Assessment Report, Bessemer Calera Expansion Project (CP24-32)”. FERC. 29 February 2024. Retrieved 3 October 2026.
  5. “FERC eLibrary docket CP24-32”. Federal Energy Regulatory Commission. 21 December 2023. Retrieved 3 October 2026.
  6. “Weekly Environmental Status Report No. 1 (March 18 to 22, 2024), Bessemer Calera Expansion Project (CP24-32)”. Southern Natural Gas Company, L.L.C. (filed with FERC). 25 March 2024. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.