Big Sandy Pipeline Phase I
From the ProvenHand pipeline wiki
Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.
Big Sandy Pipeline Phase I is a natural gas pipeline in Kentucky, operated by Equitrans, L.P.. It entered service in 2008.
| Big Sandy Pipeline Phase I | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | New build[1] |
| Status | In service[1] |
| Commodity | Natural gas[1] |
| Operator | |
| Part of | Big Sandy Pipeline Project[2] |
| State | Kentucky[1] |
| Counties | Carter, Floyd, Johnson, Lawrence[3] |
| Announced | January 2006[4] |
| Approved | 15 November 2006[3] |
| In service | April 2008[1][5] |
| FERC docket | CP06-275[1] |
| FERC pre-filing docket | PF06-12[1] |
| Technical information | |
| Length | 68 mi[1] or 67.6 mi[3][sources disagree] |
| Pipe size | 20"[1] |
| Capacity | 70 MMcf/d additional capacity (EIA)[1] |
| Cost | $60 million (EIA estimate; no dollar year given)[1] |
| On ProvenHand | |
| Hands listed | 0 |
Big Sandy Pipeline Phase I is a natural gas pipeline in Kentucky, operated by Equitrans, L.P.. It entered service in 2008.
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Big Sandy Pipeline Phase I? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “Order Issuing Certificate, Equitrans, LP, Big Sandy Pipeline Project (CP06-275)”. FERC. 15 November 2006. Retrieved 4 October 2026.
- “Implementation Plan, Big Sandy Pipeline Project (CP06-275), with the certificate order of Nov. 15, 2006 appended”. Equitrans, LP (filed with FERC). 27 November 2006. Retrieved 4 October 2026.
- “Equitable Resources press release (8-K exhibit 99.1): 2006 capital forecast announcing the Big Sandy Pipeline”. Equitable Resources, Inc. (SEC filing). 26 January 2006. Retrieved 4 October 2026.
- “Equitable Resources second quarter 2008 earnings release (8-K exhibit 99.1)”. Equitable Resources, Inc. (filed with the SEC). 1 August 2008. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.