Birdsboro Pipeline Project
From the ProvenHand pipeline wiki
Birdsboro Pipeline Project is a natural gas pipeline in Pennsylvania, operated by DTE Midstream Appalachia, LLC. It was built and entered service in 2018. It runs 13.2 miles of 12" pipe.
| Birdsboro Pipeline Project | |
|---|---|
| Also called | Planned Birdsboro Pipeline Project[1] |
| General information | |
| Kind | Pipeline project[2] |
| Project type | New build[3] |
| Status | In service[3] |
| Commodity | Natural gas[3] |
| Owner and operator | |
| State | Pennsylvania[2][3] |
| Counties | Berks[4] |
| Approved | 15 March 2018[2] |
| Construction started | March 2018[5] |
| In service | 10 December 2018[3] |
| FERC docket | CP17-409[2] |
| FERC pre-filing docket | PF17-1[2] |
| Contractors | |
| Technical information | |
| Length | 13.2 mi[2][3] |
| Pipe size | 12"[3] |
| Capacity | 79 MMcf/d (FERC project list)[2][3] or up to 79,000 Dth/d of firm transportation service[4][sources disagree] |
| Cost | $47.2 million (EIA estimate; no dollar year given)[3] |
| On ProvenHand | |
| Hands listed | 0 |
Birdsboro Pipeline Project is a natural gas pipeline in Pennsylvania, operated by DTE Midstream Appalachia, LLC. It was built and entered service in 2018. It runs 13.2 miles of 12" pipe.
Contractorsedit
| Contractor | Work | Scope |
|---|---|---|
| Infrasource[6] | Prime | Listed 2018-2019 as the pipeline construction contractor |
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
| Fact | Values given |
|---|---|
| Capacity |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Birdsboro Pipeline Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP17-409”. Federal Energy Regulatory Commission. 1 May 2017. Retrieved 3 October 2026.
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “Order Issuing Certificate, DTE Midstream Appalachia, LLC, Birdsboro Pipeline Project (CP17-409)”. Federal Energy Regulatory Commission. 15 March 2018. Retrieved 4 October 2026.
- “Biweekly status report 4/27/18 - 5/10/18, Birdsboro Pipeline Project (CP17-409)”. DTE Midstream Appalachia, LLC (filed with FERC). 10 May 2018. Retrieved 4 October 2026.
- “Ongoing Projects: Construction Underway (Pipeline News, February 2019)”. Pipeline News. February 2019. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.