Black Bayou Gas Storage Project
From the ProvenHand pipeline wiki
Black Bayou Gas Storage Project is a natural gas facility project in Louisiana, operated by Black Bayou Gas Storage, LLC.
| Black Bayou Gas Storage Project | |
|---|---|
| General information | |
| Kind | Facility project[1] |
| Project type | New build[2] |
| Status | Approved[3] |
| Commodity | Natural gas[2] |
| Owner and operator | |
| State | Louisiana[2] |
| Counties | Calcasieu, Cameron[2] |
| Approved | 24 July 2025[4] |
| FERC docket | CP24-494[1] |
| Technical information | |
| Pipe size | 24"[2] |
| Capacity | working gas capacity about 34.7 Bcf (four caverns)[2] |
| Horsepower added | 44,000 hp[2] |
| On ProvenHand | |
| Hands listed | 0 |
Black Bayou Gas Storage Project is a natural gas facility project in Louisiana, operated by Black Bayou Gas Storage, LLC.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Black Bayou Gas Storage Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP24-494”. Federal Energy Regulatory Commission. 17 July 2024. Retrieved 3 October 2026.
- “Environmental Assessment, Black Bayou Gas Storage Project (CP24-494)”. FERC staff. 18 April 2025. Retrieved 4 October 2026.
- “Bi-Weekly Status Report No. 25 (Sep 8-21, 2026), Black Bayou Gas Storage Project”. Black Bayou Gas Storage, LLC (filed with FERC). 22 September 2026. Retrieved 4 October 2026.
- “Order Issuing Certificates, Black Bayou Storage Project (CP24-494)”. FERC (order). 24 July 2025. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.