Black Warrior Storage Project
From the ProvenHand pipeline wiki
Black Warrior Storage Project is a natural gas pipeline in Mississippi, operated by Southeast Gas Storage, LLC. It runs 4.6 miles of 24" pipe.
| Black Warrior Storage Project | |
|---|---|
| General information | |
| Commodity | Natural gas[1] |
| Owner and operator | |
| State | Mississippi[1] |
| Counties | Lowndes, Monroe[1] |
| Approved | 18 December 2008[1] |
| FERC docket | CP08-418[2] |
| Technical information | |
| Length | 4.6 mi[3] |
| Pipe size | 24"[3] |
| Capacity | maximum total capacity of 34.7 billion cubic feet (storage)[1] |
| Units added | 3 (electric motor (reciprocating compressors, 8,000 hp each))[3] |
| On ProvenHand | |
| Hands listed | 0 |
Black Warrior Storage Project is a natural gas pipeline in Mississippi, operated by Southeast Gas Storage, LLC. It runs 4.6 miles of 24" pipe.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Black Warrior Storage Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “Order Vacating Certificate Authorization, Southeast Gas Storage, L.L.C. (CP08-418)”. FERC. 2 May 2011. Retrieved 4 October 2026.
- “FERC eLibrary docket CP08-418”. Federal Energy Regulatory Commission. 6 June 2008. Retrieved 3 October 2026.
- “El Paso Corporation Form 10-K for 2008 (storage projects table)”. El Paso Corporation (SEC filing). 2 March 2009. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.