Blackwell Yard Replacement Project
From the ProvenHand pipeline wiki
Blackwell Yard Replacement Project is a pipeline replacement, operated by Southern Star Central Gas Pipeline, Inc..
| Blackwell Yard Replacement Project | |
|---|---|
| Also called | Blackwell Yard Reconfiguration Project[1] |
| General information | |
| Kind | Pipeline project[2] |
| Project type | Replacement[1][2] |
| Status | Under construction[3] |
| Owner and operator | |
| Counties | Kay[1] |
| FERC docket | CP26-103[2] |
| Technical information | |
| Pipe size | 26"[1] |
| Cost | $16,700,000[1] |
| On ProvenHand | |
| Hands listed | 0 |
Blackwell Yard Replacement Project is a pipeline replacement, operated by Southern Star Central Gas Pipeline, Inc..
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Blackwell Yard Replacement Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “Environmental Assessment Report for Southern Star Central Gas Pipeline, Inc.'s Prior Notice – 157.205, 157.208(b) under CP26-103.”. Federal Energy Regulatory Commission (staff document). 5 May 2026. Retrieved 3 October 2026.
- “FERC eLibrary docket CP26-103”. Federal Energy Regulatory Commission. 25 February 2026. Retrieved 3 October 2026.
- “Southern Star Central Gas Pipeline, Inc. submits Weekly Environmental Report No. 11 for the period of 09/21/2026 to 09/27/2026 re the Blackwell Yard Reconfiguration Project under CP26-103.”. Southern Star Central Gas Pipeline, Inc. (filed with FERC). 2 October 2026. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.