Blind Canyon Compressor Engine Upgrade Project
From the ProvenHand pipeline wiki
Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.
Blind Canyon Compressor Engine Upgrade Project is a pipeline project in Utah, operated by Questar Pipeline. It entered service in 2012.
| Blind Canyon Compressor Engine Upgrade Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] or Facility project[2][sources disagree] |
| Project type | Uprate[2] |
| Status | In service[3] |
| Owner and operator | |
| State | Utah[4] |
| Counties | Duchesne[4] |
| In service | 15 June 2012[3] |
| FERC docket | CP12-43[1] |
| Technical information | |
| Units added | 1 × Solar Centaur 50-5900LS (5,900 hp each)[2] |
| Cost | $2,127,000[2] |
| On ProvenHand | |
| Hands listed | 0 |
Blind Canyon Compressor Engine Upgrade Project is a pipeline project in Utah, operated by Questar Pipeline. It entered service in 2012.
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Blind Canyon Compressor Engine Upgrade Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP12-43”. Federal Energy Regulatory Commission. 5 January 2012. Retrieved 3 October 2026.
- “Environmental Assessment Report, Blind Canyon Compressor Engine Upgrade Project (CP12-43)”. FERC. 20 January 2012. Retrieved 4 October 2026.
- “Post-construction noise survey, Blind Canyon Compressor Station (CP12-43)”. Questar Pipeline Company (filed with FERC). 12 February 2013. Retrieved 4 October 2026.
- “FERC notice of request under blanket authorization, Blind Canyon Compressor Engine Upgrade Project (CP12-43)”. FERC. 19 January 2012. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.