Blue Mountain Chisholm Trail Project
From the ProvenHand pipeline wiki
Blue Mountain Chisholm Trail Project is a natural gas pipeline lateral in Oklahoma, operated by Southern Star Central Gas Pipeline, Inc.. It was built and entered service in 2018. It runs 4.7 miles of 12" pipe.
| Blue Mountain Chisholm Trail Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Lateral[1] |
| Status | In service[1][2] |
| Commodity | Natural gas[1] |
| Operator | |
| Owner and operator | |
| Facility project | |
| State | Oklahoma[1] |
| Counties | Garvin, OK; Stephens, OK[5] or Carter, OK; Grady, OK[4][sources disagree] |
| Construction started | January 2018[6] |
| In service | 9 June 2018[1] |
| FERC docket | CP18-17[1] |
| Technical information | |
| Length | 4.7 mi[1][4] |
| Pipe size | 12"[1][4] |
| Capacity | 150 MMcf/d additional capacity (EIA)[1] |
| Cost | $21 million (cost stated in FERC staff EA)[4] |
| On ProvenHand | |
| Hands listed | 0 |
Blue Mountain Chisholm Trail Project is a natural gas pipeline lateral in Oklahoma, operated by Southern Star Central Gas Pipeline, Inc.. It was built and entered service in 2018. It runs 4.7 miles of 12" pipe.
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Blue Mountain Chisholm Trail Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “Final Environmental Inspector's Weekly Report No. 20 (June 3 to 9, 2018), Blue Mountain Chisholm Trail Project (CP18-17)”. Southern Star Central Gas Pipeline, Inc. (filed with FERC). 12 June 2018. Retrieved 3 October 2026.
- “FERC eLibrary docket CP18-17”. Federal Energy Regulatory Commission. 14 November 2017. Retrieved 3 October 2026.
- “Environmental Assessment Report, Blue Mountain Chisholm Trail Project (CP18-17)”. FERC. 19 January 2018. Retrieved 3 October 2026.
- “Ongoing Projects: Construction Underway (Pipeline News, October 2018)”. Pipeline News. October 2018. Retrieved 3 October 2026.
- “Environmental Inspector's Weekly Report No. 1 (January 22 to 28, 2018), Blue Mountain Chisholm Trail Project (CP18-17)”. Southern Star Central Gas Pipeline, Inc. (filed with FERC). 31 January 2018. Retrieved 3 October 2026.