Bossier Loop Phase 1
From the ProvenHand pipeline wiki
Bossier Loop Phase 1 is a natural gas pipeline expansion in Louisiana, operated by Regency Intrastate Pipeline Co. It entered service in 2006. It runs 16 miles of 24" pipe.
| Bossier Loop Phase 1 | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Expansion[1] |
| Status | In service[1] |
| Commodity | Natural gas[1] |
| Operator | |
| State | Louisiana[1] |
| In service | October 2006[1] |
| Technical information | |
| Length | 16 mi[1] |
| Pipe size | 24"[1] |
| Capacity | 100 MMcf/d additional capacity (EIA)[1] |
| Cost | $25 million (EIA estimate; no dollar year given)[1] |
| On ProvenHand | |
| Hands listed | 0 |
Bossier Loop Phase 1 is a natural gas pipeline expansion in Louisiana, operated by Regency Intrastate Pipeline Co. It entered service in 2006. It runs 16 miles of 24" pipe.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Bossier Loop Phase 1? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.