Bradwood Landing LNG
From the ProvenHand pipeline wiki
Bradwood Landing LNG is a pipeline project in Oregon and Washington, operated by Bradwood Landing LLC. It runs 36.3 miles.
| Bradwood Landing LNG | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Owners and operators | |
| States | Oregon, Washington[1] |
| Approved | 18 September 2008[1] |
| FERC docket | CP06-365[1] |
| Technical information | |
| Length | 36.3 mi[1] |
| Capacity | 13000 MMcf/d (FERC project list)[1] |
| On ProvenHand | |
| Hands listed | 0 |
Bradwood Landing LNG is a pipeline project in Oregon and Washington, operated by Bradwood Landing LLC. It runs 36.3 miles.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Bradwood Landing LNG? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.