Buckeye Xpress is a natural gas pipeline expansion in Kentucky, Ohio and West Virginia, operated by Columbia Gas Transmission, LLC. It entered service in 2020.

Buckeye Xpress
General information
KindPipeline project[1]
Project typeExpansion[1]
StatusIn service[1]
CommodityNatural gas[1]
Operator
Owner and operator
StatesKentucky, Ohio, West Virginia[1][3]
CountiesOhio: Gallia, Jackson, Lawrence, Vinton
West Virginia: Wayne
[3]
In service21 December 2020[1]
LaborUnion[4]
FERC docketCP18-137[1]
FERC pre-filing docketPF17-6[2]
Contractors
Technical information
Length64 mi[1] or 66.2 mi[3][sources disagree]
Pipe size20", 24", 36"[1][3]
Capacity275 MMcf/d additional capacity (EIA)[1]
Capacity added275,000 dekatherms per day of firm transportation service[3]
Cost$707 million (EIA estimate; no dollar year given)[1] or $709,200,216 (Columbia's estimate, 2018 application)[3][sources disagree]
On ProvenHand
Hands listed0

Buckeye Xpress is a natural gas pipeline expansion in Kentucky, Ohio and West Virginia, operated by Columbia Gas Transmission, LLC. It entered service in 2020.

Contractorsedit

ContractorWorkScopeSpreadYears
U.S. Pipeline, Inc.[5]PrimeInstallation of 18.5 miles of 36-inch pipeline and abandonment of 16 miles of 20-inch pipeline in OhioSpread 21 January 2020
Associated Pipe Line Contractors, Inc.[6]PrimeSpreads 3 and 4 together: 22.3 miles of 36-inch new lay for TC Energy, pre-jobbed at Ironton, OH (approx. completion Nov 2020); one of three contractors on the four Ohio spreadsSpread 3from 1 January 2020
Associated Pipe Line Contractors, Inc.[6]PrimeSpreads 3 and 4 together: 22.3 miles of 36-inch new lay for TC Energy, pre-jobbed at Ironton, OH (approx. completion Nov 2020); one of three contractors on the four Ohio spreadsSpread 4from 1 January 2020
Associated Pipe Line Contractors, Inc.[4]PrimeContracted by TC Energy with two other union contractors to build the four Ohio spreads (about 66 miles of 36-inch), per the union's March 2020 report

Spreads

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Cost
  • $707 million (EIA estimate; no dollar year given)[1]
  • $709,200,216 (Columbia's estimate, 2018 application)[3]
Length

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Buckeye Xpress? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  2. “FERC eLibrary docket CP18-137”. Federal Energy Regulatory Commission. 26 March 2018. Retrieved 3 October 2026.
  3. “Notice of Application, Columbia Gas Transmission, LLC, Buckeye XPress Project (CP18-137 et al.)”. FERC (public notice, eLibrary). 9 April 2018. Retrieved 4 October 2026.
  4. “Blue Light Reports, March/April 2020”. Pipeliners Local Union 798. March 2020. Retrieved 6 October 2026.
  5. “Recent Projects - U.S. Pipeline (project map)”. U.S. Pipeline, Inc. Retrieved 3 October 2026.
  6. “Blue Light Reports, May/June 2020 (pre-jobs)”. Pipeliners Local Union 798. May 2020. Retrieved 6 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.