Calypso Pipeline Project (LNG/Bhms
From the ProvenHand pipeline wiki
Calypso Pipeline Project (LNG/Bhms is a pipeline project in Florida, operated by Calypso U.S. Pipeline, LLC. It runs 41.8 miles.
| Calypso Pipeline Project (LNG/Bhms | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Owner and operator | |
| State | Florida[1] |
| Approved | 24 March 2004[1] |
| FERC docket | CP01-409[1] |
| Technical information | |
| Length | 41.8 mi[1] |
| Capacity | 832 MMcf/d (FERC project list)[1] |
| On ProvenHand | |
| Hands listed | 0 |
Calypso Pipeline Project (LNG/Bhms is a pipeline project in Florida, operated by Calypso U.S. Pipeline, LLC. It runs 41.8 miles.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Calypso Pipeline Project (LNG/Bhms? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.