Cameron Extension Project
From the ProvenHand pipeline wiki
Cameron Extension Project is a natural gas pipeline expansion in Louisiana, operated by Texas Eastern Transmission, LP/Cameron Extension Project. It entered service in 2021. It runs 0.2 miles of 20" pipe.
| Cameron Extension Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Expansion[2] |
| Status | In service[2][3] |
| Commodity | Natural gas[2] |
| Operator | Texas Eastern Transmission, LP/Cameron Extension Project[1] |
| Operator | |
| Owner and operator | |
| State | Louisiana[1][2] |
| Counties | Beauregard, Calcasieu, Cameron, Jefferson Davis[4] |
| Approved | 18 June 2020[1][4] |
| In service | 9 December 2021[2][3] |
| FERC docket | CP19-512[1] |
| Technical information | |
| Length | 0.2 mi[1][2] |
| Pipe size | 20 in[2] or 30 in[4][sources disagree] |
| Capacity | 750 MMcf/d (FERC project list)[1][2] |
| Units added | 1 (gas turbine)[4] |
| Cost | $149 million (EIA estimate; no dollar year given)[2][4] |
| On ProvenHand | |
| Hands listed | 0 |
Cameron Extension Project is a natural gas pipeline expansion in Louisiana, operated by Texas Eastern Transmission, LP/Cameron Extension Project. It entered service in 2021. It runs 0.2 miles of 20" pipe.
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Cameron Extension Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “Notice of Commencement of Service, Cameron Extension Project (CP19-512)”. Texas Eastern Transmission, LP (filed with FERC). 10 December 2021. Retrieved 4 October 2026.
- “Order Issuing Certificate, Texas Eastern Transmission, LP (CP19-512)”. Federal Energy Regulatory Commission. 18 June 2020. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.