Cameron LNG Liquefaction Project

From the ProvenHand pipeline wiki

Cameron LNG Liquefaction Project is a pipeline project, operated by Cameron Lng, LLC.

Cameron LNG Liquefaction Project
General information
Owner and operator
Approved19 June 2014[2]
FERC docketCP13-25[1]
FERC pre-filing docketPF12-13[1]
Doe lng dockets11-145-LNG[3], 11-162-LNG[3]
On ProvenHand
Hands listed0

Cameron LNG Liquefaction Project is a pipeline project, operated by Cameron Lng, LLC.

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Cameron LNG Liquefaction Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC eLibrary docket CP13-25”. Federal Energy Regulatory Commission. 7 December 2012. Retrieved 3 October 2026.
  2. “Order Granting Authorization under Section 3 of the Natural Gas Act & Issuing Certificates, Cameron LNG, LLC et al. (CP13-25 et al.)”. FERC (eLibrary filing description). 19 June 2014. Retrieved 4 October 2026.
  3. “DOE: Long Term Applications Received by DOE to Export Domestically Produced LNG, CNG, CGL from the Lower-48 States (as of September 30, 2026)”. U.S. Department of Energy, Office of Fossil Energy and Carbon Management. 30 September 2026. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.